Laserfiche WebLink
1.2 As used in this Agreement, (A) the masculine gender shall include the feminine and <br />neuter and the singular number shall include the plural, and vice versa, (B) unless <br />expressly stated otherwise, references to a governmental authority includes any <br />government authority succeeding such authorities functions and capacities, (C) "days" <br />shall mean calendar days, unless the term "Business Days" is used (if the time for <br />performing an obligation under this Agreement expires on a day that is not Business <br />Day, the time shall be extended until that time on the next Business Day), (D) where a <br />word or phrase is specifically defined, other grammatical forms of such word or phrase <br />have corresponding meanings; the words "herein," "hereunder," "hereof' and this <br />"Agreement" refer to this Agreement, taken as a whole, and not to any particular <br />provision of this Agreement; (E) "including" means "including, for example and without <br />limitation," and other forms of the verb "to include" are to be interpreted similarly, and <br />(F) all references to a given agreement, instrument or other document shall be a reference <br />to that agreement, instrument or other document as modified, amended, supplemented <br />and restated through the date as of which such reference is made. <br />ARTICLE 2 - OVERVIEW OF THE PROJECT AND SERVICES <br />2.1 The Project. <br />(a) Overview. The Company will be responsible for developing a "turn -key" project <br />(the "Project") to finance, design, construct, install, operate and maintain a 30,000 <br />GPD Wastewater evaporation plant featuring a Type 3 LM -HTS Heartland <br />Concentrator'`'' System, with a rated processing capacity of up to 30,000 GPD (the <br />"Evaporation Plant") to be located at the Landfill as more fully depicted on the <br />visual representation attached as Appendix A to this Agreement. A process now <br />diagram (PFD) of the proposed Evaporation Plant is attached hereto as Appendix <br />B. The Company shall have title to and bear the risk of loss with respect to the <br />Evaporation Plant during the Term. The Evaporation Plant shall at all times remain <br />the property of the Company until it is transferred to the District at the end of the <br />Term as contemplated in Section 5.1(c). <br />(b) Flexibility of Thermal Energy Fuel Source. To provide additional process <br />flexibility, the Evaporation Plant will be designed to utilize the thermal energy <br />generated by an enclosed flare with a dual -fuel burner configuration allowing it to <br />operate on 100% natural gas, or 100% raw landfill gas (LFG) or a combination of <br />both simultaneously. The Parties anticipate that: <br />(i) The Evaporation Plant will operate on LFG up until the time which a portion <br />of the LFG from the Landfill gets allocated to the RNG Facility project <br />currently in development with the IRED at a site adjacent to the Landfill. <br />(ii) When the RNG Facility is ready to use LFG, the first 1,150 SCFM of LFG <br />from the Landfill may be directed to the RNG Facility. If there is <br />insufficient LFG to fully support the Facility's needs at any time, then the <br />Page 6 of 32 <br />