My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-100A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-100A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2021 3:33:01 PM
Creation date
8/16/2021 2:40:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/13/2021
Control Number
2021-100A
Agenda Item Number
15.B.1.
Entity Name
Indian River Sustainability Center, LLC
Indian River Eco District
Heartland Water Technology, Inc
Proximo Energy, LLC
Subject
Leachate Treatment Agreement
Solid Waste Disposal District
Area
1325 74th Avenue SW (the Landfill)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
District will' supply the Facility with supplemental natural gas in sufficient <br />quantities to operate the Evaporation Plant. <br />(iii) The District will always, in its sole discretion, have the ability to send all of <br />the Landfill's LFG to the RNG Facility plant and supply natural gas to the <br />Evaporation Plant, should this be in the District's economic interest. <br />2.2 The Services. <br />(a) Processing Prior to COD. The Company will process such amounts of the District's <br />Wastewater as needed to complete the start-up and commissioning of the <br />Evaporation Plant. The District will pay the Company for such services as more <br />fully described in Article 4 of this Agreement. <br />(b) Processing Wastewater During the Operating Term. During the Operating Term, <br />the Company will process (by evaporation) the District's Wastewater (up to a <br />maximum of 30,000 GPD) at the Facility and such other items that are described <br />on the DOR; provided that the District provides sufficient quantities of Wastewater <br />and other required inputs as required herein (collectively, the "Services"). <br />(c) Volume Reduction Requirement. Assuming the Wastewater provided by the <br />District falls within the Operating Parameters set forth on Appendix E attached <br />hereto, during the Operating Term, the Company will deliver a minimum volume <br />reduction of 95% or more (the "Volume Reduction Requirement") which will <br />result in approximately 5% or less of the volume treated being left in Processed <br />Residual which will be removed from the Facility by the District as more fully <br />described in the DOR. <br />ARTICLE 3 - DIVISION OF RESPONSIBILITIES <br />3.1 Division of Responsibilities. A detailed DOR is attached to this Agreement as Appendix <br />C — Part 2. <br />3.2 The Company's Responsibilities and Obligations. <br />(a) From the Effective Date to the date on which the District has secured the required <br />Permits for the Project which are more fully described in the Appendix D (the <br />"Permit Receipt Date"), the Company will be responsible for putting in place <br />any financing arrangements, providing technical support as reasonably requested <br />by the District in connection with its effort to secure the Permits, designing the <br />Evaporation Plant and ordering certain long lead time parts and equipment. <br />(b) From the Permit Receipt Date until the COD, the Company shall complete <br />fabrication, ship the Evaporation Plant equipment to the Facility, install, <br />commission, and test of the Evaporation Plant equipment. The period during <br />which the Company is installing, commissioning and testing the Evaporation <br />Page 7 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.