Laserfiche WebLink
Kimley»>Horn' <br />Page 2 <br />The three lowest bids were within +/- 2% of the Engineer's Opinion of Probable <br />Construction Costs (OPCC), without contingency. <br />Kimley-Horn has positive experiences working with TLC Diversified on pump station and water <br />treatment plant related construction projects. Most recently, Kimley-Horn worked with TLC <br />Diversified to replace blowers at the South Oslo Road WTP, which was -completed in March <br />2021. TLC is. also currently completing the construction for the Roseland Pump Station and <br />Transmission Main project. <br />In addition to our experience with TLC, references were included within TLC's bid package to <br />satisfy the requirements of "Instructions to Bidders," specifically for three (3) references as <br />required per 1.03 C. The references that responded to inquiries included the City of Orlando, <br />Key Colony Beach, and the City of Winter Gardens. Each of these municipalities had a project <br />with TLC that was of similar size and scope and provided satisfactory reviews. <br />Based on the results of our review, TLC Diversified submitted the lowest responsive, <br />responsible bid for the project. We see no reason IRCUD should not award the complete <br />contract, including all of the additive alternates, to TLC Diversified, Inc. <br />Should you have any questions or comments, please do not hesitate to contact this office at <br />(561) 840-0258.. <br />Sincerely, <br />KIMLEY-HORN AND ASSOCIATES, INC. <br />Nick.Slack, P.E. <br />Attachment: Bid Tab, TLC Bid <br />Cc: Terry Southard (IRCUD) <br />Matt Jordan, P.E. (IRCUD) <br />Mike Vernon (IRCUD) <br />Cindy. Corrente (IRC) <br />Jennifer Hyde (IRC) <br />Mark Miller, P.E. <br />Bert King, E.I. <br />K:1wPB_Civi11044572100 - South RO WTP Design\Bidding\Bid Review\Oslo WTP Improvements - KHA Bid Review.docx <br />kim e horn.com 1920 Wekiva Way, Suite 200, West Palm Beach, FL 33411 561 845 OF6,i7 <br />i,,-+, <br />