Laserfiche WebLink
PROJECT DATA <br />Project Volue $12:5 Million <br />Date Cerriple►ed: Jiro. 14, MM <br />CONTACT <br />Steve. Shelnutt <br />City of Orlando=Plant Manager.. <br />a 407246:4119 <br />3teve:shel6u1l@cilyoforlondo.nei <br />TLC GiversifeU-'vVater.And V'ostewater•!n <br />CONS'ERV If WRF IMPROVEMENTS PHASE 1 <br />I RLANRO, FLORIDA PROJECT 112,401 <br />FUrnishecl cnd iAstalled.nev., uerction sy. tprn --.,users in 10 cerction <br />bosins:includmga]l new' -24." ALP p'ipmg. Rom blower building-io <br />the aeration.systerri - this work included the removal and disposol �. <br />oF2,500 CY of,grit, modifications to existing blower building <br />and replacement of existing: blowers wilt new fiigh.efficiency <br />turbo -blowers -with 300 -hp VFDs; new Anternal recycle pump <br />'stations including 48" ,:'36" , -24" �ond20'' piping, valves and <br />'oppurtenances; struct.ural.modificotions tospliiterbox: repiocement i <br />of `the four existing 120' "diameter clanfief mecho6sms; mod::codons <br />to the intermediate pump stations;by chonging.o.ut the motors on the <br />250hp vertical turbine.punips and re:cutting`1he irnpe'llers` n_stallcWon i <br />of 2;800 ]lineal feet'of 48" double borr61.he'odworks effluent line; <br />flow improvements to the aeration bosins with l0.new slide gates <br />and 2 -new weir gates; electricol upgrades including an MCC with <br />"a,copacity of 1,600 amp' fond new switchgedr raled:o► 3,200 <br />amps new:instrumentation dnd controls.system. The plant capacity is <br />'24MGD_ <br />x , <br />.. fi .fit• L ,4' _ r . <br />S,�•ivrP i"il 9y" S .i "y 1� ,� e?Fg � �� �- <br />�' <br />T <br />i BL -Smith Electric 'Dundee,,FL EIecldcol <br />l <br />rctu:e:Since 1.99.5 <br />