Laserfiche WebLink
PROJECT DATA <br />A Project Value: $82 Million <br />Datc Completed: July 7,,20]7° " <br />C®NTACT <br />n .Al !Martini, PE: <br />Hiilsborough County Project Manager <br />813209:3069 <br />martinio@hillsboroughi bunty:org <br />MALRIC0 AWWTP HEADWORKS REPLACEMENT <br />HILLSBOROUGH COUNTY; FLORIDA PROJECT 14.2701 j <br />! <br />This prai@Ct rrtVGiVcd t is "cOnsi`uGia Cf C br0^d-^e.' f eadwarl s <br />facility rated for o 25MGD treatment facility. The structure itself i <br />included 1;900 cubic yards of concrete hat wospoured—in-place <br />byour•own in-house form carpenters and finishers. -The structure`s <br />foundation was`supported with an'auger`cost pile :system that I <br />provided a soil bearing capa.city.of 2,500 psf. The protec3 involved <br />over 4,000 feet of 12" to.36" DI and PV, epiping `ond valves, _24" <br />and 30" tapping sleeve & volve..Cleaning of the Primary Digester <br />Tank. We furnished a ad.installed all new:degritting equipment, <br />mechanical screens, slide,gates,,variable frequency drives; all i <br />new.electrical with .concrete duct banks, ISG, grit pumping and <br />dewotennquipment, auto=sampling equipment; raw sewage <br />influent flow'metering and monitoring equipment ,'LED lighting <br />YS as Well as an odor.conirol treatment facility. After :start -.up <br />and commissioning was complete, we demolished the entire existing I <br />l eadworks structure -and all "associoted paving, ton,crete, piping, <br />etc. ; <br />BL Sm+th,Electric. Dundee, FL: Electricol i <br />r <br />agg <br />C2i; Inc Smyrna, OA instrumentation ' <br />f <br />s <br />J <br />TLC Di srsi le"d-Vi'o�,er.And W; s'hL.J✓`,.7tefSince 193,;i.... 182... 1 <br />r 1. <br />t <br />,i <br />