Laserfiche WebLink
SWDD Item <br />Indian River County, Florida <br />Solid Waste Disposal District <br />Board Memorandum <br />Date: June 7, 2021 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: Himanshu H. Mehta, PE, Managing Director, Solid Waste Disposal District (SWDD) <br />Subject: Change Order N0.1 to SCS Field Services for Landfill Segment 3 Cell 1 Landfill Gas System <br />Expansion Project (Bid #2021006) <br />Descriptions and Conditions: <br />On February 9, 2021, the Indian River County (IRC) Solid Waste Disposal District (SWDD) awarded Bid <br />#2021006 for the construction of the Landfill Segment 3 Cell 1 Landfill Gas System Expansion to Sterns, <br />Conrad, and Schmidt Consulting Engineers, Inc. dba SCS Field Services. The grand total bid award for the <br />project was for $1,068,510.00, which included $96,810.00 in bid contingency and bid alternative. <br />SWDD utilized CDM Smith to provide the initial Phase 1 design, permitting, and bidding assistance for this <br />project in accordance with the approved Work Order No. 2 dated May 19, 2020, in the amount of <br />$199,810. The Phase 2 construction services was also authorized by the SWDD Board on February 9, 2021, <br />to CDM Smith as Amendment No. 1 to Work Order No. 2 in the amount of $139,190, for total engineering <br />costs of $339,000. <br />Staff requested additional items through CDM Smith to optimize the capture of gas. Staff requested the <br />consideration for the installation of four additional landfill gas wells and extension of the side slope <br />collectors in the form of horizontal wells. Also, in order to address perched leachate issues in Cell 2, SCS <br />Field Services was requested to perform video and jet cleaning of the existing collection system. Finally, <br />the upsizing of the existing condensate piping was requested in order to accommodate higher leachate <br />pumping in Cell 1. CDM Smith has reviewed, approved, and recommended the attached Change Order <br />No. 1 to SCS Field Services (Attachment 1). <br />Analysis: <br />Given the recent approval of the 2nd Amendment to the Landfill Gas Agreement to the Indian River Eco <br />District, LLC, which requires a target of 1,150 standard cubic feet per minute (scfm) of landfill gas and the <br />fact that we are currently at an average of 500 scfm, staff requested additional vertical and horizontal gas <br />well screens to increase the total output production of our landfill. Also, with the leachate continuing to <br />be a challenge in hindering gas production, steps are recommended to remove the leachate from the <br />landfill as efficiently as possible. <br />233 <br />SWDD Agenda - Change Order No. 1 for Segment 3 Cell 1 Landfill Gas Expansion Project (Bid No. 2021006) Page 1 of 2 <br />