My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-111
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2021 11:01:38 AM
Creation date
9/7/2021 12:08:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/17/2021
Control Number
2021-111
Agenda Item Number
8.P.
Entity Name
TLC Diversified, Inc.
Subject
South Oslo Road WTP (water treatment plant) SCADA System Improvements.
Bid Number
2021046
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530 — EJCDC STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE <br />South Oslo Road WTP SCADA System Improvements <br />THIS AGREEMENT ('Agreement" or "Contract"), dated the17th day of August in the year 2021 by <br />and between Indian River County, a political subdivision of the State of Florida (hereinafter called <br />OWNER) and TLC Diversified. Inc. (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish and <br />complete all of the necessary labor, material, and equipment to perform the work as specified <br />or indicated in the Contract Documents and per Indian County Department of Utility Services <br />(IRCDUS) standards. The work is generally described as follows: <br />Construct electrical and SCADA system improvements, including, but not limited to, <br />installation of new high service pump PLC panel, hardware upgrades to existing Main PLC <br />panel, conduit, wiring and any other items as depicted on the plans and in these specifications <br />to provide a complete and functional system at Indian River County's South Water Treatment <br />Plant (Oslo). <br />ARTICLE 2 ENGINEER <br />The South Oslo Road WTP SCADA System Improvements project has been designed by Kimley- <br />Hom and Associates, Inc., hereinafter called ENGINEER, and who is to act as OWNER'S <br />representative, assume all duties and responsibilities and have the rights and authority assigned to <br />ENGINEER in the Contract Documents in connection with completion of the work in accordance with <br />the Contract Documents. <br />ARTICLE 3 CONTRACT TIME <br />3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 30 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Submit shop drawings for all materials and equipment to be utilized on the job. <br />3. Perform all photographic recording and documentation of conditions prior to <br />construction. <br />4. Locate all existing utilities in the area of work. <br />5. Secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials and prepare the site. <br />7. Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 31 calendar days to 150 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />Install all electrical equipment, panel, hardware, conduit, wiring, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.