Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/17/2021
Control Number
2021-111
Agenda Item Number
8.P.
Entity Name
TLC Diversified, Inc.
Subject
South Oslo Road WTP (water treatment plant) SCADA System Improvements.
Bid Number
2021046
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
appurtenant items. <br />2. Perform all equipment start-ups and field testing. <br />3. Restore all disturbed areas to their pre -construction condition. <br />4. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes Substantial <br />Completion. <br />(c) From 151 calendar days to 180 calendar days from the effective date of Notice <br />to Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />4. Demobilize. <br />3.2 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute <br />Final Completion. <br />3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence <br />of this Agreement and that OWNER will suffer financial loss if the work is not completed within <br />the times specified in Paragraph 3.1 above, plus any extensions thereof allowed in accordance <br />with Article 12 of the General Conditions. They also recognize the delays, expense and <br />difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the <br />work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and <br />CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) <br />CONTRACTOR shall pay OWNER four -hundred and fifty dollars ($250.00) for each day that <br />expires after the time specified in Paragraph 3.1 for Substantial Completion, if CONTRACTOR <br />shall neglect, refuse or fail to complete the remaining work within the Contract Time or any <br />proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER four -hundred <br />and fifty dollars ($250.00) for each day that expires after the time specified in Paragraphs 3.1 <br />and 3.2 for completion and readiness for final payment. <br />3.3.1 The CONTRACTOR and OWNER agree that OWNER is authorized to deduct <br />all or any portion of the above -stated liquidated damages due to the Owner from <br />payments due to the Contractor; or, in the alternative, all or any portion of the <br />above -stated liquidated damages may be collected from the Contractor or its <br />Surety or Sureties. These provisions for liquidated damages shall not prevent <br />the OWNER, in case of the CONTRACTOR's default, from terminating the <br />Contractor's right to proceed as provided in this AGREEMENT. <br />3.3.2 In addition to the above -stated liquidated damages, the CONTRACTOR shall be <br />responsible for reimbursing OWNER to third party consultants in administering <br />the Project beyond the Final Completion date specified in this Agreement, or <br />beyond an approved extension of time granted to CONTRACTOR, whichever <br />date is later. <br />ARTICLE 4 CONTRACT PRICE <br />4.1 OWNER shall pay CONTRACTOR for completion of the work in accordance with the Contract <br />Documents in current funds in the amount of $241,800 <br />