Laserfiche WebLink
1.4.1.1 Maintain close liaison and cooperation with the OWNER during performance of the <br />work hereunder to obtain agreement and coordination of the various phases of work contained herein. <br />1.4.1.2 Attend all meetings and conferences as arranged and required by the OWNER g <br />durin <br />the progress of the work hereunder to establish design concepts, to review preliminary and final drawings, <br />to the work. <br />secure agreement upon comprehensive and detailed basis of design, and discuss any other matters relating <br />1.4.1.3 Provide the OWNER with written memoranda to confirm and record the <br />understandings and agreements resulting from meetings and conferences . <br />1.4.1.4 Provide the OWNER with schedules, including starting dates and contemplated <br />completion dates for the several salient features of the work. <br />1.4.1.5 Assist the OWNER by furnishing the design data for the preparation of all documents <br />necessary for any Federal, State, City, or County approvals, or permits. Fees for these permits are the <br />responsibility of the OWNER. <br />1.5 Provide the OWNER with statements of estmeted construction costs, construction schedules, and <br />other preliminary data concerning construction of the proposed fiber optics network and electronics, Including <br />verification of the project limits and scope of the work in relation to other new work being done or to be done <br />In the surrounding areas which may connect with or otherwise affect the projects under this agreement, for use <br />In overall analysis and planning of the PROJECT. <br />1.6 Advise the OWNER as to the necessity of obtaining further services from others and act as the <br />OWNER'$ representative in connection with any such services. <br />1.6.1 Evaluate information of conditions to be encountered at the site essential for design <br />and construction purposes, and Investigate all available information necessary to accurately indicate existing <br />and proposed locations of underground utilities and facilities. <br />the PROJECT. 1.8.2 Consult with the OWNER to establish general design criteria and standards for use In <br />of the PROJECT1.8.3 Prepare design drawings and construction asbuilts consisting of detail documentation <br />1.6.4 Prepare a statement of estimated construction costs for the build phase of the <br />PROJECT based on the design criteria for the communication electronics as approved by the OWNER. <br />1.6.5 Prepare design data, survey date and required engineering documents in order to <br />secure, with assistance of the OWNER, approval of such governmental authorities as have jurisdiction over <br />Installation Right of Way to the PROJECT. <br />1.6.6 In the event the <br />elects not to utilize "PCS" for the <br />uction services, an <br />services desired of PCS" for Inspections construction management or ther remedial services elated to the <br />cable or electronic system's Installation Is not covered by this agreement and will require additional <br />remuneration before any services would be performed. <br />Section 2. PCS Responsibilities. Basic Construction Services. - <br />SECTION 2 iS NOT APPLICABLE UNLESS COUNTY ELECTS TO EXERCISE IT'S OPTION TO UTILIZE <br />"PCS" TO PERFORM INSTALLATION SERVICES DESCRIBED BY THIS AGREEMENT. <br />Not withstanding any section to the contr®ry. the Owner may negotiate with others or bid out tho <br />consbuation phase of the protect if the owner deems that to be In the best Interest of the owner. <br />2.1 Statement of Construction Services. "PCS" shall perform all work and shall furnish all supervision, <br />labor, materials, tools, equipment, supplies and incidentals necessary for the complete installation and <br />Integration fo the fiber optic network as described in the avetems dminn eine-11m..,. -- -__ <br />