My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-046
CBCC
>
Official Documents
>
1990's
>
1996
>
1996-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2021 1:02:54 PM
Creation date
9/27/2021 12:34:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/1996
Control Number
1996-046
Entity Name
Precision Contracting Services, Inc.
Subject
Design & Surveying Services for a fiber optic cable
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />3 <br />' +lot F• t <br />��. <br />d5 <br />R '?L1t <br />'.. � . .. '. <br />2.2 Commencement of Work. "PCS" shall not commence work without prior written authorization <br />from the OWNER, and thereafter shall commence work on various phases only after the OWNER's <br />representative and "PCS" have reached a mutually acceptable design for the necessary activities, materials <br />and procedures. <br />_ ^ <br />2.3 Time of Performance. "PCS" will proceed with design activities in a prompt and diligent manner <br />"> <br />so as to not delay the construction phase of the required communication network. "PCS" will not proceed with <br />any construction activities until the OWNER has agreed in writing to amend this document for Inclusion of such <br />w. <br />additional activities. <br />4 <br />I <br />2.3.1 The design phase of the contract is dependent on several factors outside of "PCS"'s,or <br />OWNER's control; ght-of-way approval, Interdepartmental response and permitting; however Is anticipated <br />+ <br />not to exceed sixty (60) days. <br />6 <br />2.3.2 The construction phase of the contract is dependent on the design phase and Its <br />direction for optimizing OWNER resources in regard to material acquisition, Installation method and route and <br />-' <br />system utilization. After the design phase has been completed to the satisfaction of the OWNER, an anticipated <br />^ <br />time for completion for the construction phase will be generated. <br />Section 3. The OWNER'S RESPONSIBIUTIES. The OWNER will, when deemed necessary: <br />3.1 Advise as to Its requirements for the work. <br />3,2 Assist "PCS" byplacing at his disposal all available information pertinent to the site of the work, <br />`t <br />including previous reports, documents, preliminary design, subsurface soil analysis, and any other data relative <br />to planning, design, and construction. <br />3.3 Guarantee access to and make all provisions for "PCS" to enter upon public and private lands, <br />j <br />as required for "PCS" to perform his work under this contract. <br />3.4 Examine all studies, reports, sketches, estimates, specifications, drawings, proposals, and <br />other documents presented by "PCS" and shall render in writing decisions pertaining thereto within a <br />E <br />reasonable time so as not to delay the work of "PCS". <br />} <br />3.5 The OWNER will designate in writing those persons to act as the OWNER'S representative <br />with respect to the work to be performed under this <br />pa agreement, and such persons shall have complete authority <br />to transmit instructions, receive information, and interpret and define the OWNER'S policies and decisions with <br />respect to the work covered by this agreement. <br />3.6 Assist "PCS" In securing approval of all governmental authorities having jurisdiction over the <br />j <br />projects and such approvals and consents from such other Individuals or bodies as may be necessary for <br />t <br />completion of the work, <br />tv'¢Y°'tig <br />x„ .. <br />3.7 Furnish or direct "PCS"to provide, at the OWNER'S expense, any necessary additional <br />4, <br />' <br />services required In connection with the work that may be required by the OWNER, provided that any such <br />i4 <br />direction shall be given in writing by the OWNER. <br />.. <br />Section 4. PAYMENTS FOR THE SERVICES OF PCS. <br />%<> <br />4.1 The OWNER shall pay to "PCS" for all services actually, timely, and faithfully rendered a total <br />not to exceed of'Twenty Five Thousand Five Hundred Dollars, $25,500.00, for all design services under this <br />agreement. Payment for installation services, that maybe added through addendum, for the fiber optic cabling <br />x,. <br />and electronics network, will be based on previous proposals and negotiated In good faith after reviewing any <br /><x <br />modifications to said proposal pursuant to the design services required by this document at the request of the <br />OWNER. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.