My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-179
CBCC
>
Official Documents
>
1990's
>
1996
>
1996-179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 12:57:41 PM
Creation date
9/27/2021 12:42:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/06/1996
Control Number
1996-179
Entity Name
Allcomm Network, Inc.
Subject
Fiber Optic Installation
Bid Number
IRC-6080
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d * � � � f, •ty t t. <br />` of <br />`.; 6:5! '-AS-Built Diraving Requiremenls ••,,:_ <br />6.54';- Prior to Final Acceptance, the Contractor shall utilize the Global Positioning system <br />surveying technique to accurately identify the position of the fiber optic cable every 500' <br />. along the installation. The CONTRACTOR shall' "submit to the Owner four (4) sets of <br />As -Built Plans and two (2) additional sets of reproducibles,'This plan set"shall show,the.. <br />{ exact way in which the installation was constructed, including all changes during the <br />.: •,�_ course of -the project. As a minimum, the plan set shall show the following'. <br />•' , ''` 5 2.; Cominurvc_ations cable routing, puU box locations, fiber cable test readings <br />5;3 The CONTRACTOR'shall correct any errors to the As=Built pians upon review by <br />t the'ENGINEER before Final Acceptance is complete. <br />7,0`, MEASUREMENT& PAYMENT <br />7.1 ,. Requests for payment in accordance with terms of, the contract shall consist of the <br />following: <br />7.2 ..`The Contractor's -will show, in summary form, the basis for arriving at the amount -of the <br />invoice., Payment requests must reflect the compensatory unit items reflected in this Proposal <br />a document. Invoices will be due on the 15th and 30th of each month and shall be ,paid- within '30 <br />days of receipt exctudin¢ a t0%retainage to he held tintil Final Arl'4-_nt5lnne nn the nmiPrt <br />7.3 Payments -made in -accordance with the contract shall be made on submission of itemized.. <br />requests'by the Contractor arnd'shall be_subject .to reduction for overpayments, or- increase for. <br />underpayments on preceding .payments to the Contractor. <br />7.4 The:obligation'of the Government to make payments required under the provisions of this ; <br />contract shall, at the discretion of the contracting Officer, be subject to the following: <br />a. Reasonable deductions due to defects in material or workmanship; <br />b. Claims which.the Government may have against the Contractor under or in <br />` �' connection with this contract; and <br />c, Unless otherwise adjusted, repayment to the Government upon demand for <br />overpayments to the Contractor. <br />8.0 NOTICES <br />, <br />8.1 Notices to the CONTRACTOR pursuant to these Specifications `shall be deemed to have <br />been properly sent when mailed to the CONTRACTOR at the address provided on the bid form. <br />jt h'C <br />:. 8.2 Notices to the County shall be deemed to have been properly sent when mailed to the <br />Purchasing Manager of the County at the address stated -for the mailing -of bids on the Invitation <br />to Bid: <br />j- ! •. r. • ... .. <br />'fir �`: ._ •. <br />,��� � �_...•:-y �.,�'. ���� �f..'s� �� *•,;-_ *�' .- .` w.iF,�p�� • . .. r _ . , � ��. ,� �1=� : '�} i fia�Q:.p,,-Fkw i-FL�"��•,' ry� ""� <br />rte. <br />.^' � * _��^ ', '�, •' . .... • „.... ..._...,.,a�,.,_......,.� �� c.� �.... <... ... _ eersa�L�: Bey .. ____..-a1hw�IrrYeit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.