Laserfiche WebLink
No Intermediate Metallic Conduit (IMC) or thin-wall indoor -type electrical <br />conduit shalt be permitted on this project. <br />3.1.4 'Underground Conduit Installation <br />Type of conduit shall be TC6-PVC and shall be 2" or 4" with three (3) 1 1/4" <br />innerducts where specified in the plans. The top of the conduit shall be not less <br />than 24 inches below grade, and shall have a minimum slope of 3 inches in each 100 <br />feet away from buildings and toward manholes and other necessary drainage <br />points. Run conduit in straight lines except' where a change of direction is <br />necessary.. Grade bottom of trench smooth; where rock, soft spots, or sharp - <br />edged materials are encountered, excavate the bottom for an additional 3 inches, <br />fill and tamp level with original bottom with sand or earth free from particles, that <br />would be retained on a 1/4 -inch sieve. Provide color, type and depth of the <br />detectable warning tape, Thor "Terra" tape or approved equal, as specified <br />with label "WARNING - BURIED FIBER OPTIC CABLE - WARNING ". <br />Except at conduit risers, accomplish changes in direction of runs exceeding a total <br />of 90 degrees, either vertical or horizontal, by long sweep bends having a minimum <br />radius of curvature of 10 feet; Manufactured bends shall have a minimum radius of <br />24 inches for use with conduits of less than 3 inches in diameter and a minimum <br />radius of 36 inches for ducts of 3 inches in diameter and larger. Excavate trenches <br />along straight lines from structure to structure before ducts are laid or structure <br />constructed so the elevation can be adjusted, if necessary, to avoid unseen <br />obstruction. <br />3.1.5 Direct Bury Construction <br />Bury cables directly in earth as shown on the plans, except under railroad tracks, <br />paved areas, and roadways, and where specified to install cables in conduit. <br />Utilize the "plow" method of cable placement to direct bury the fiber cable and a <br />detectable tape. Excavate to a depth that allows a minimum cable cover of 30 <br />inches to the top of the cables. Trenches shall be in straight lines. Bends in trenches <br />shall have a radius of not less than 36 inches. <br />When rock is encountered, remove to a depth of at least 3 inches below the cable <br />and fill the space with sand or clean earth free from particles larger than U4 inch. <br />Replace sod which has been removed, as soon as possible after backfilling is <br />completed. Restore areas disturbed by trenching, storing of dirt, cable ilaying, pad <br />construction, and other work to original condition and maintain until final <br />acceptance. Provide necessary topsoiling, fertilizing, liming, seeding, sodding, <br />sprigging or mulching. <br />