Laserfiche WebLink
ORDER NO. PSC -2021 -0252 -PAA -EQ <br />DOCKET NO. 20210067 -EQ <br />PAGE 12 <br />F ORMA POtVFR & LICITi'CQ',A3i'AiVY <br />(C:oatinued from Sheet No, 4.033.1) <br />Testing Procedures <br />Attachment A <br />Third Revised Shect:No. 9.034 <br />Cancels Second. Shert Na: 9.034 <br />6-I The Committed Capacity Test armst be connpleted successfully within a sixty -hour period (the "DomottsU ition. Per nod"j, w hich <br />period, including"the approximate start rime of the Committed Capacity Test, shall be selected and scheduled by the QS by moans ora written <br />notice to FPL delivered at least ll"y (30) days prior to (he start of such period, The _ptovisicns.of die foregoingsentence shall not apply to <br />any Committed Ca)mcityTest_required by FPL anter any ofthe Provisions of thisContract. FPi shall have the right to be- present,cstuate 16 <br />monitor any Committed C apacity'Test required or Ix ninined taurlerthis C;.ontruc. <br />6.2 Committed Capacity Test mums shatt be based on a test period of twenty-four (24) consecutive hours (the "Cotmrdtted <br />Capacity Test, Period') at the Highest sustained net VVV rating at which the Facility can operate without erceedirul the design Operating <br />conditions; temperature; pressures, antd other Parameters defined by the applicable manufictumr(s) for steady state Operations at the Faeihty. <br />1f be_QS is a ltFFthe Cornrrvtted.0 apacity Test Aalt-lie conducted utiliAng as the sole fuel source fuels or energy sources. in the <br />definition in Section 360.91., Florida Statutes, The Committed Capacity Test Period shalt commence at the time designated by the QS <br />pursuant to Section 6.1 or at such other time requested by pursuant to Section 5.3; provided, however, that the Contrai tted Capacity Test <br />Period may cormxnence earlier than such time in the event that FPL is notified of and consents to, such earlier time. <br />6.3 For: the avoidanoc,of doubt, ttoimal station service use of wit-atedliarres, including, without limitation, cooling towers, heat <br />exchangers; and other. equipment required by law, shall be in service during the Committed Capacity T Test Period. Further, Or. QS shall alrect <br />deliveries of any quantity trod quality ofooutracted cogenerated steam to the $team',host during the Committed C apacity'l'est. Period. <br />6A The capacity of Ute facility shall be the average net capacity (generator output minas awdliary) measured over the Committed <br />Capacity Test Period. <br />6.5 The Committed. Capacity Test shall be performed according to prudent industry t6tir4 procedures satisfactory to FPL for the <br />appropriate iectmology of the QS. <br />6:6 Except. as Otherwise Provided herein, results oftmy Committed Capacity Test dmil be smbnutted to FPL bythe.QS within seven <br />(7) clays of the conchwiran,oftbe c m initted Capacity"fest.. <br />Payment torZteciricity Produced by the Fuctlity <br />7.1 Enemy <br />PPL agrees to pay the QS for energy produced by One Pacihty azul delivered to the DJI ivery Point in accordance tvith.the rates and <br />procedures contained in FPL's.approved Rate Schcdulc QS -2, attedied hereto as Appendix A, as it may be atncrtded:from time to time and <br />pursuant'to th'e%olection orenergy,payment options as spedrfied in Appendix E. The Parties agree that this Contract: -hall hesubject 'to ell of <br />the provisions contained :in Kate Schedule QS -2 as approved and on We with the FPSC. <br />7,2 Finn. Capacity <br />FPL- agrees to pity the QS for the,finn capacity. described in Section 5 in accordance with .Ute rates mid procedures contained in <br />Rate Schedule QS -2, attached hereto as Aplx nc ix A; as it may amended and approved from time to tittle by the FPSC, and ptnsuartt:.to the <br />election of a capacity payment _option as specified in Appendix E. The QS understands and agrees that capacity payments wilt be -made under, <br />the early capacitypayment options only ifthe QS.has Achieved the Capacity Delivery Date and is deliverirq; firm capacity and.energy to FPL. <br />Once elected by the QS, the capacity payment option cannot•be clanged during the term of this Contract. <br />7.3 Payments <br />Payments due ihe::QS will be made monthly and normally by the'twentieth business day following the end of the: billing period. 'A <br />statement of the,lalowatt-hours sold by the QS and the applicable;avoided energy fate at which payments are being made shall accompany the <br />pityment to the QS. <br />.(Continued on Sheet No. 9:035) <br />Issued by: Tiffany Cohen, Director, Rates andTariffs <br />Effective:. 3une;9; 2020 <br />�' 0 <br />