ORDER NO. PSC -2021 -0252 -PAA -EQ <br />DOCKET NO. 20210067 -EQ <br />PAGE 13 <br />Attachment A <br />Second 12e'<dced Shect No. 9.035 <br />FLORIDA POWER Sr LIGHT COMPANY Cancels First Sheet Nei. 9.03{ <br />(Continued from Shoot leo. 9.011) <br />8: Electricity Production and Plant Matatenance.Schedule <br />8.l During the term of this Contract, no Inter than sWy (60) days:prior to the Capacity Delivery Date and prior to April i of each. <br />calendar year thereafter; the QS .shall submit. to F.PL in writing a'detailed plan of (a) the amormtof,finn capacity and energy to be generated <br />by tlre'Facili'ty and delivered to die 'Delivery Poutt for each month of the following calendar year, and (b) the. time, duration and,traagrutude of <br />any schedtrled maintenance periods) and any anticipated -reduction. in capacity. <br />8.2 ByOctober 31 of each calendar year, FPL shall notify the QS in writing wiltether the requested scheduled maintenance periods <br />in the detailed plan are acceptable. If FP1.. object.,. to any ofthe requested schedulcd maintenance periods, F1TL shall advise the Q$ of the time <br />period closest to the .requested period(s) when the cartage(s) can be scheduled. The QS shall schedule maintenance outages only during. <br />periods approved by FPL, such approval not. unreasonably withheld. Once due schedule for nnaintemuce has been established and approved <br />by FPL, either Party may request a subsequent chance in such scheduleand, except when such event is dire to Force Majeure, request. <br />approval for such change from the other Party, such approval not to be unreasonably withheld or delayed. Scheduled maimetianee outage <br />days shall be,litnited to seven (7) days,per, calendar year unless the manufacturer's recommendation of maintenance outage days for the <br />fecluxrlogy and equipment used by the Facility exceads.such. 7 day period, provided, such number of days .is corn idered reasrntabic by <br />prudent industry standards and does not exceed two, (2) fourteen (14) day intervals, one tri file Spurrkq mid one in the Fall, in any calendar <br />ymr. The scheduled rrraintenairoe.vutage nays 6 plicabie for the QS are — days in the Sitting and hays in the Fall ofeachi �denditr <br />year; provided die conditions specifiedinprevious sentence arc satisfied, In no cvcntshudl rrrandenance periods be scheduled during the <br />following periods: June l through and including Octobar 31st and December i through and includirj'February 28 (or 29a' as the sass may <br />be). <br />8.3 The QS shall comply scant reasonable requests by FPL regarding day -to -dray and hour -by -hour com urtication between the <br />Parties relative to electricity production and maintenance scheduling. <br />RA Mgmtch and Control <br />R.A.1 The power supplied by the QS hereunder shall be in the form of duce -phase 60 Hertz alternating current. at.a nominal. <br />operating voltage of—___ ,000 volts (.___--__ W) and power ,factor di.spatchable and controllable in the range of 85% Jagging to <br />85% leading as rueasured at die Delivery Point to rnat`ntaiu system operating parameters; as specified by F'PL. <br />8:4.2 At ali'times during the term of this Contract, the QS shall operate and maintain .thc Tacilityr (a) in such a manner as to ensure <br />compliance with its obligations hereunder. in accordance with prudent engineering and operating practices and applicable law, and (b) with <br />all system protective:equiprnent in service whenever the Facility is conm^cted to, or is.trperated in parallel with, M's system. The QS shall <br />install at the Facility those system protection and control devices necessary to ensure safe and protected operation of all energized equipment <br />during hornial testing and .repair, Tile .QS -shrill have qualified personnel test and calibrate all protective equipment at regular intervals in <br />accordance with good engineering and operating practices. A tout fintctional trip test shall be performed alter each overhaul of the Facility's <br />turbine, generator or boilers and the results shall be provided to FPL prior to returning the Facility to service. The specifics of the unit <br />functioned hgin <br />hip lest will be consistent with good eneering and operating practices: <br />8.4.3 tribe Facility is separated .from the FPL system for any reason, under Ito circumstances shall the QS reconnect the Facility <br />into FPL's system without first obtaining FIVs prior.writlen approval. <br />8.4.4 During the term of this Contract; the QS shall t.mTloy qualified personnel for mmnaging, operating and maintaining the <br />Facility and for coordinating such whit FPL. If tine Facility has it committed capacity gr- ter than 10 MW item, the QS shall ensure, that, <br />operatirrit. personnel are.onduty at all times, twenty-four (24) hours a calendar day and seven (7) calendar days a week If the Facifity has a <br />Committed Cnpocity equal to or less than 10 MW then the QS shall ensure that operating personnel are on ditty at least eight (8) hours per <br />day from 8.AM EST to 5 PM EST from Moridayto Friday, with an operator on cart at all other hours. <br />8.4.5 FPL shat! at all titues be excused $om its obligation to purchase and receive energy and capacity hereunder, and FPL shall <br />have the ability to require the QS to curtail or reduce deliveries ofenergy, to the e�;tent reces;✓an, (a):to maintain the reliability and integrity <br />so is,likelyto endanger life or property, or (a) is likely to <br />of any part r+f FPt's system, (tr) in the eycrii.ihnt.l"PL detenrunes da,at a failure to do . <br />insult in significant disruption ofelectric service to l PL's customers. FPL shall give the QS prior notice, if practicable, ofitsintent to refuse, <br />curtail or redact M's acceptance otenetgy and finu capacity pursuant to: this Section and will act to nminize the frequency and duration <br />ofsuch occurrences. <br />(Continued on Sheet No: 9:036) <br />Issued by: S. E. Romig; Director, Rates and Tariffs <br />E1Teclive: Sepletuber 13,2016 <br />i'iS <br />