My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-147
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2021 10:01:40 AM
Creation date
10/19/2021 9:58:32 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A P T I M September 10, 2021 <br />Page 5 of 7 <br />authorized by the permit. All documents will be provided to the County for review prior to submittal to the <br />FDEP. <br />Cost <br />The lump sum cost for this task is $16,134.00. <br />Task 7: Check Surveys <br />APTIM will conduct up to two (2) independent check surveys to evaluate discrepancies that may arise <br />between the Contractor's requested pay volume and APTIM's computed pay volume based on the <br />construction plans. This will allow for a prompt, independent check should questions arise regarding the <br />data obtained by the surveyor retained by the Contractor to perform pay surveys. The surveys will be <br />conducted with land-based equipment and extend to sufficient wading depth to complete the data check. <br />Deliverable <br />APTIM will include the check survey cross-sections in the Project Completion Report, if applicable. <br />Schedule <br />A fixed timeline cannot be provided because it is dependent upon the Contractor's progress and pay <br />survey results. APTIM will mobilize in an expeditious manner according to construction progress. <br />Cost <br />The lump sum cost for this task is $6,050.00 <br />Task 8: Construction Phase Sea Turtle and Shorebird Monitoring <br />APTIM will oversee the scope of work proposed by EAI and provide the necessary administrative <br />coordination to the County. EAI has provided the enclosed proposal and cost breakdown for sea turtle <br />and shorebird monitoring tasks, which states: <br />Construction -phase sea turtle and shorebird monitoring and ancillary professional services in <br />support of the Sector 3 Beach and Dune Nourishment project. This scope of work was developed <br />based on conditions and requirements set forth in standard regulatory permits and the following <br />documents: <br />• Florida Department of Environmental Protection (FDEP) Joint Coastal Permit (JCP) No. <br />0285993 -009 -JC <br />• U. S. Fish and Wildlife Service (USFWS) Revised Statewide Programmatic Biological <br />Opinion (BO) dated March 13, 2015 <br />The following tasks will be performed under this work order include: <br />• Task 1: Pre -construction Meeting <br />• Task 2: Daily Sea Turtle Monitoring and Data Management <br />• Task 3: Nighttime Sea Turtle Monitoring <br />• Task 4: Sea Turtle Nest Protection <br />• Task 5: Construction -phase Nesting Shorebird Monitoring and Protection <br />
The URL can be used to link to this page
Your browser does not support the video tag.