My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-150
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2021 4:24:29 PM
Creation date
10/19/2021 11:37:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/21/2021
Control Number
2021-150
Agenda Item Number
15.B.5.
Entity Name
CDM Smith Inc.
SWDD
Subject
Amendment No. 2, Work Order No. 2, Segment 3 Cell 1 Landfill Gas Collection System Expansion
Engineering services during construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />AMENDMENT NO. 2 TO WORK ORDER NO.2 <br />INDIAN RIVER COUNTY LANDFILL <br />SEGMENT 3 CELL 1 <br />LANDFILL GAS COLLECTION SYSTEM EXPANSION <br />ENGINEERING SERVICES DURING CONSTRUCTION <br />This Amendment No. 2 to Work Order No. 2, when executed, shall be incorporated in and become <br />part of the Agreement for Consulting Services between Indian River County Solid Waste Disposal <br />District (COUNTY) and -CDM Smith Inc., (CONSULTANT), dated July 18, 2017, hereafter referred to <br />as the AGREEMENT. This agreement is the final reconciliation change order for the project as the <br />construction services have been completed. <br />BACKGROUND <br />The COUNTY has requested that CONSULTANT prepare this Amendment to Work Order No. 2 to <br />provide professional engineering services during construction for the proposed Class I Landfill <br />Segment 3 Cell 1 landfill gas (LFG) collection system expansion. The proposed landfill collection <br />system expansion is for the construction of vertical and horizontal landfill gas collection wells, <br />header pipes, compressed air piping, and leachate forcemains. The design and permitting was <br />completed and the project was advertised to bid in COUNTY Bid No. 2021006. Bid opening was <br />January 6, 2021. <br />This Amendment No. 2 includes additional engineering services to assist with diverting leachate <br />flow from the sideslope of Segment Hill into the drainage later of Cell 2. The COUNTY sought a <br />solution for diverting condensation being pumped out of the landfill gas wells away from the <br />leachate collection system so it would not be sent to the wastewater treatment plant. This <br />prompted some upsizing of the condensate forcemains and the inclusion of additional valves so it <br />could be diverted to new Frac Tanks for hauling. The COUNTY also sought to maximize the amount <br />of landfill gas being collected so additional landfill gas wells were added to the current design and <br />the horizontal collectors were extended to maximize the amount of landfill gas that could be <br />extracted. <br />The Scope of Services for Additional Engineering Services During Construction, of the landfill gas <br />expansion system is described below: <br />SCOPE OF SERVICES <br />CONSULTANT will provide engineering services during construction to act as the COUNTY's <br />representative during the construction of the project. Based on recent discussions with COUNTY <br />staff and our familiarity with the landfill site design of the project, the proposed Scope of Services <br />includes the following tasks as a continuation of the previously approved tasks. <br />A-1 <br />jj3123_Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.