Laserfiche WebLink
EXHIBIT A <br />AMENDMENT NO. 2 TO WORK ORDER NO.2 <br />INDIAN RIVER COUNTY LANDFILL <br />SEGMENT 3 CELL 1 <br />LANDFILL GAS COLLECTION SYSTEM EXPANSION <br />ENGINEERING SERVICES DURING CONSTRUCTION <br />This Amendment No. 2 to Work Order No. 2, when executed, shall be incorporated in and become <br />part of the Agreement for Consulting Services between Indian River County Solid Waste Disposal <br />District (COUNTY) and -CDM Smith Inc., (CONSULTANT), dated July 18, 2017, hereafter referred to <br />as the AGREEMENT. This agreement is the final reconciliation change order for the project as the <br />construction services have been completed. <br />BACKGROUND <br />The COUNTY has requested that CONSULTANT prepare this Amendment to Work Order No. 2 to <br />provide professional engineering services during construction for the proposed Class I Landfill <br />Segment 3 Cell 1 landfill gas (LFG) collection system expansion. The proposed landfill collection <br />system expansion is for the construction of vertical and horizontal landfill gas collection wells, <br />header pipes, compressed air piping, and leachate forcemains. The design and permitting was <br />completed and the project was advertised to bid in COUNTY Bid No. 2021006. Bid opening was <br />January 6, 2021. <br />This Amendment No. 2 includes additional engineering services to assist with diverting leachate <br />flow from the sideslope of Segment Hill into the drainage later of Cell 2. The COUNTY sought a <br />solution for diverting condensation being pumped out of the landfill gas wells away from the <br />leachate collection system so it would not be sent to the wastewater treatment plant. This <br />prompted some upsizing of the condensate forcemains and the inclusion of additional valves so it <br />could be diverted to new Frac Tanks for hauling. The COUNTY also sought to maximize the amount <br />of landfill gas being collected so additional landfill gas wells were added to the current design and <br />the horizontal collectors were extended to maximize the amount of landfill gas that could be <br />extracted. <br />The Scope of Services for Additional Engineering Services During Construction, of the landfill gas <br />expansion system is described below: <br />SCOPE OF SERVICES <br />CONSULTANT will provide engineering services during construction to act as the COUNTY's <br />representative during the construction of the project. Based on recent discussions with COUNTY <br />staff and our familiarity with the landfill site design of the project, the proposed Scope of Services <br />includes the following tasks as a continuation of the previously approved tasks. <br />A-1 <br />jj3123_Exhibit A <br />