My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-150
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2021 4:24:29 PM
Creation date
10/19/2021 11:37:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/21/2021
Control Number
2021-150
Agenda Item Number
15.B.5.
Entity Name
CDM Smith Inc.
SWDD
Subject
Amendment No. 2, Work Order No. 2, Segment 3 Cell 1 Landfill Gas Collection System Expansion
Engineering services during construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 7.0 - GENERAL ENGINEERING SERVICES DURING CONSTRUCTION <br />Subtask 7.10 CONSULTANT reviewed design drawings and added additional landfill gas <br />extraction wells. The CONSULTANT also reviewed field conditions and <br />recommended solutions to lateral leachate seepage on the north face of Segment 2 <br />landfill and recommended remedial action and facilitated changes with the <br />Contractor to implement the changes. <br />SCHEDULE <br />There was no change to the project schedule. <br />PAYMENT AND COMPENSATION <br />Compensation for this Amendment No. 2 to Work Order No. 2 described herein shall be made in <br />accordance with the Contract between SWDD and CONSULTANT. The lump sum amount of this <br />Work Order No. 2, for Task 7 is $8,500. The new total not -to -exceed amount of Work Order No. 2 is <br />$347,500. <br />For invoice purposes only, the value of each task in this Amendment No. 2 is as shown in Table 1. <br />Table 1 <br />TASK VALUE FOR INVOICE PURPOSE —AMENDMENT NO. 2 TO WORK ORDER NO. 2 <br />TASK <br />DESCRIPTION VALUE <br />7.0 <br />General Engineering Services During Construction <br />$8,500 <br />Lump Sum = <br />$8,500 <br />TOTAL AMENDMENT NO. 2 TO WORK ORDER NO. 2 (lump Sum) - <br />$8,500 <br />TOTAL AMENDMENT NO. 1 TO WORK ORDER NO. 2 (NTE) _ <br />$139,190 <br />ORIGINAL WORK ORDER NUMBER 2 (NTE) <br />$199,810 <br />GRAND TOTAL AMOUNT FOR WORK ORDER NO. 2 (Lump Sum) _ <br />$347,500 <br />Smith A-2 <br />jj3123 Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.