My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-166
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 12:38:46 PM
Creation date
11/2/2021 12:37:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/12/2021
Control Number
2021-166
Agenda Item Number
15.B.4.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work Order 44 for Landfill Gas Flare Skid Improvements and Pipeline Extension
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC— Professional Services <br />• Allocate and assign key engineering resources (such as controls, mechanical, and process <br />engineers) as necessary to support the project during critical design review stages; <br />• Review detailed drawings, calculations and other information submitted by the Heartland <br />engineering team. These include natural gas and LFG piping designs, mechanical piping <br />drawings, electrical and controls designs for valves, instruments and other electrical <br />equipment that could affect the Client's Landfill assets. <br />• Review the master project schedule and provide comments to the Client regarding risks <br />in achieving critical milestones by the developer. Please note that to do this, BGE will <br />request monthly schedule updates from Heartland and provide comments as necessary. <br />• As the OE, BGE will monitor the engineering and coordination performed by <br />developer/contractor of the facility. <br />• As the OE, BGE will review all design and equipment specifications regarding the <br />integration of piping with the Client landfill system. <br />• Perform site visits if necessary. <br />We propose a lump sum of $19,400 for this task. This task will be billed at the end of each on <br />an percent completion basis at the end of each month. We will allocate resources as necessary <br />to support project progress. Any travel expenses will be billed per the attached rate schedule <br />as well. This cost estimate is based on our project understanding at this time, BGE will inform <br />the Client if additional budget is necessary to support ongoing activities. <br />COST SUMMARY <br />Provided below is the summary of the costs proposed in this proposal. <br />We propose a total cost of $176,800 for the project, which will be billed per the payment <br />scheduled described above. We propose a net 30 payment terms from the date of the invoice. <br />EXCEPTIONS <br />The following items are excluded from this scope of work: <br />• Review of environmental impact assessments or traffic studies and reports; <br />• Design to provide any service connections to the site (electrical, natural gas, <br />communication, etc.); <br />• Site visits in addition to what is covered urder this proposal, <br />B!OGAS ENGINEERING 5 www.biogasen.g.com +1 (562) 786-5056 <br />Tabl6 I.- 6�t summary <br />Task <br />Detail <br />Type <br />Cost <br />1 <br />New Blower Flare Skid Design — Phase 1 <br />Engineering Design <br />LS <br />$92,100 <br />_ <br />2 <br />Expenses _ <br />BFS Design Related PM and Procurement Services <br />T&M <br />$8,000 <br />LS <br />$20,200 <br />3 <br />4 <br />Utility Trench Engineering Design <br />Utility Trench Related PM and Procurement Services <br />LS <br />LS <br />$21,800 <br />$15,300 <br />5 <br />Heartland Related OE arid PM Services IS <br />Total: <br />$19,400 <br />$176,800.00 <br />We propose a total cost of $176,800 for the project, which will be billed per the payment <br />scheduled described above. We propose a net 30 payment terms from the date of the invoice. <br />EXCEPTIONS <br />The following items are excluded from this scope of work: <br />• Review of environmental impact assessments or traffic studies and reports; <br />• Design to provide any service connections to the site (electrical, natural gas, <br />communication, etc.); <br />• Site visits in addition to what is covered urder this proposal, <br />B!OGAS ENGINEERING 5 www.biogasen.g.com +1 (562) 786-5056 <br />