IRC— Professional Services <br />• Allocate and assign key engineering resources (such as controls, mechanical, and process <br />engineers) as necessary to support the project during critical design review stages; <br />• Review detailed drawings, calculations and other information submitted by the Heartland <br />engineering team. These include natural gas and LFG piping designs, mechanical piping <br />drawings, electrical and controls designs for valves, instruments and other electrical <br />equipment that could affect the Client's Landfill assets. <br />• Review the master project schedule and provide comments to the Client regarding risks <br />in achieving critical milestones by the developer. Please note that to do this, BGE will <br />request monthly schedule updates from Heartland and provide comments as necessary. <br />• As the OE, BGE will monitor the engineering and coordination performed by <br />developer/contractor of the facility. <br />• As the OE, BGE will review all design and equipment specifications regarding the <br />integration of piping with the Client landfill system. <br />• Perform site visits if necessary. <br />We propose a lump sum of $19,400 for this task. This task will be billed at the end of each on <br />an percent completion basis at the end of each month. We will allocate resources as necessary <br />to support project progress. Any travel expenses will be billed per the attached rate schedule <br />as well. This cost estimate is based on our project understanding at this time, BGE will inform <br />the Client if additional budget is necessary to support ongoing activities. <br />COST SUMMARY <br />Provided below is the summary of the costs proposed in this proposal. <br />We propose a total cost of $176,800 for the project, which will be billed per the payment <br />scheduled described above. We propose a net 30 payment terms from the date of the invoice. <br />EXCEPTIONS <br />The following items are excluded from this scope of work: <br />• Review of environmental impact assessments or traffic studies and reports; <br />• Design to provide any service connections to the site (electrical, natural gas, <br />communication, etc.); <br />• Site visits in addition to what is covered urder this proposal, <br />B!OGAS ENGINEERING 5 www.biogasen.g.com +1 (562) 786-5056 <br />Tabl6 I.- 6�t summary <br />Task <br />Detail <br />Type <br />Cost <br />1 <br />New Blower Flare Skid Design — Phase 1 <br />Engineering Design <br />LS <br />$92,100 <br />_ <br />2 <br />Expenses _ <br />BFS Design Related PM and Procurement Services <br />T&M <br />$8,000 <br />LS <br />$20,200 <br />3 <br />4 <br />Utility Trench Engineering Design <br />Utility Trench Related PM and Procurement Services <br />LS <br />LS <br />$21,800 <br />$15,300 <br />5 <br />Heartland Related OE arid PM Services IS <br />Total: <br />$19,400 <br />$176,800.00 <br />We propose a total cost of $176,800 for the project, which will be billed per the payment <br />scheduled described above. We propose a net 30 payment terms from the date of the invoice. <br />EXCEPTIONS <br />The following items are excluded from this scope of work: <br />• Review of environmental impact assessments or traffic studies and reports; <br />• Design to provide any service connections to the site (electrical, natural gas, <br />communication, etc.); <br />• Site visits in addition to what is covered urder this proposal, <br />B!OGAS ENGINEERING 5 www.biogasen.g.com +1 (562) 786-5056 <br />