IRC— Professionul Services <br />• LFG transmission line from BFS to the Heartland Facility; <br />• Compressed air line for pneumatic valves and pumps (if required); <br />• Prepare material and construction specifications as necessary for the installation of the <br />utility trench; <br />• Any other future lines required by IRC; and <br />• Any control conduits required to communicate between new BFS and Heartland Facility; <br />and <br />Under this task, BGE team will design the trench detail, pipe sizes, conduit sizes etc. and will rely <br />on Kimley-Horn to perform the survey of the site and prepare the trench alignment drawings <br />which will also address the traffic requirements to keep landfill operations going without <br />interruption. BGE will review the design drawings once the design is complete. <br />We propose a lump sura estimate of $21,800 for the design and engineering of the transmission <br />lines and associated utilities. This will be billed on the following schedule: <br />• 20% at the issue of request for information; <br />• 60% at 60% design completion phase (alignment); <br />• 20% upon the completion of the draft design drawings. <br />This cost does not anticipate a separate travel will be required to complete this task, therefore, <br />no travel expenses are included in this task. <br />TASK 4: Utility Trench Related Project Management and Procurement <br />Services <br />Under this task, BGE will prepare a separate package to receive bids for the procurement and <br />construction of the Utility Trench. Provided below is the list of activities covered under this <br />task. <br />• Conduct bidding for the alignment of the trench. <br />• Hold pre-bid meeting with the perspective bidders and provide project information <br />• Answer contractors' questions pertaining to the design. <br />• Prepare bid comparison spreadsheet and present to the client for review <br />• Hold bid review call and provide recommendation for the selection of the contractor <br />We propose a lump sum cost of $15,300 for this task. This task will be billed on an agreed upon <br />percent completion basis at the end of each month. <br />I -ASK 5: Hartland Related Owner's Engineer and PM Services <br />BGE will work closely with IRC and Heartland to review the overall design, equipment <br />specifications and construction plan of the Heartland Facility. As the owner's engineer (OE) and <br />project manager, BGE will review the details of the system integration between the Heartland <br />Facility equipment and the Client's proposed landfill assets. BGE will perform the following <br />activities under this task: <br />BIOGAS ENGINEERING ~�- 4 wwrw.biogsseng.i orn +1 (5621, 786-5656 <br />