My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-166
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 12:38:46 PM
Creation date
11/2/2021 12:37:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/12/2021
Control Number
2021-166
Agenda Item Number
15.B.4.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work Order 44 for Landfill Gas Flare Skid Improvements and Pipeline Extension
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC— Professionul Services <br />• LFG transmission line from BFS to the Heartland Facility; <br />• Compressed air line for pneumatic valves and pumps (if required); <br />• Prepare material and construction specifications as necessary for the installation of the <br />utility trench; <br />• Any other future lines required by IRC; and <br />• Any control conduits required to communicate between new BFS and Heartland Facility; <br />and <br />Under this task, BGE team will design the trench detail, pipe sizes, conduit sizes etc. and will rely <br />on Kimley-Horn to perform the survey of the site and prepare the trench alignment drawings <br />which will also address the traffic requirements to keep landfill operations going without <br />interruption. BGE will review the design drawings once the design is complete. <br />We propose a lump sura estimate of $21,800 for the design and engineering of the transmission <br />lines and associated utilities. This will be billed on the following schedule: <br />• 20% at the issue of request for information; <br />• 60% at 60% design completion phase (alignment); <br />• 20% upon the completion of the draft design drawings. <br />This cost does not anticipate a separate travel will be required to complete this task, therefore, <br />no travel expenses are included in this task. <br />TASK 4: Utility Trench Related Project Management and Procurement <br />Services <br />Under this task, BGE will prepare a separate package to receive bids for the procurement and <br />construction of the Utility Trench. Provided below is the list of activities covered under this <br />task. <br />• Conduct bidding for the alignment of the trench. <br />• Hold pre-bid meeting with the perspective bidders and provide project information <br />• Answer contractors' questions pertaining to the design. <br />• Prepare bid comparison spreadsheet and present to the client for review <br />• Hold bid review call and provide recommendation for the selection of the contractor <br />We propose a lump sum cost of $15,300 for this task. This task will be billed on an agreed upon <br />percent completion basis at the end of each month. <br />I -ASK 5: Hartland Related Owner's Engineer and PM Services <br />BGE will work closely with IRC and Heartland to review the overall design, equipment <br />specifications and construction plan of the Heartland Facility. As the owner's engineer (OE) and <br />project manager, BGE will review the details of the system integration between the Heartland <br />Facility equipment and the Client's proposed landfill assets. BGE will perform the following <br />activities under this task: <br />BIOGAS ENGINEERING ~�- 4 wwrw.biogsseng.i orn +1 (5621, 786-5656 <br />
The URL can be used to link to this page
Your browser does not support the video tag.