Laserfiche WebLink
EXHIBIT B <br />FEESCHEDULE <br />The Consultant will provide these services in accordance with our Continuing Consulting <br />Engineering Services Agreement for Professional Services dated May 18, 2021, by and <br />between INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br />("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />Kimley-Horn will perform Tasks 1 and 2 for the total lump sum fee of $226,420, as <br />detailed below. Individual task amounts are informational purposes only. All permitting, <br />application, and similar project fees will be paid directly by the County. <br />Task Description <br />KHA <br />Labor <br />Subtotal <br />Subs <br />Expenses <br />Task Total <br />BioGas <br />Survey <br />Geotech <br />Task 1- Landfill Gas Pipeline Design <br />$ 31,280 <br />$ 56,50.0 <br />$ 2,000 <br />$ 2,000 <br />$ - <br />$ 91,780 <br />1.1 Preliminary Design Services <br />$ 5,330 <br />$ - <br />$ 2,000 <br />$ 2,000 <br />$ - <br />$ 9,330 <br />1.2 Landfill Gas Pipeline Design <br />$ 20,550 <br />$ 37,100 <br />$ - <br />$ - <br />$ - <br />$ 57,650 <br />1.3 Coordination with Heartland <br />$ 5,400 <br />$ 19,400 <br />$ - <br />$ - <br />$ - <br />$ 24,800 <br />Task 2 - Landfill Gas Skid Design <br />$ 14,340 <br />$112,300 <br />$ - <br />$ - <br />$ 8,000 <br />$ 134,640 <br />2.1 Request for Information <br />$ - <br />$ 9,210 <br />$ - <br />$ - <br />$ - <br />$ 9,210 <br />2.2 30% Design <br />$ 1,570 <br />$ 27,630 <br />$ - <br />$ - <br />$ 8,000 <br />$37,200 <br />2.3 60% Design <br />$ 2,020 <br />$ 27,630 <br />$ - <br />$ - <br />$ - <br />$ 29,650 <br />2.4 90% Design and Final Bid Package <br />$ 2,620 <br />$ 27,630 <br />$ - <br />$ - <br />$ - <br />$ 30,250 <br />2.5 Bidding and Project Management <br />$ 6,180 <br />$ 20,200 <br />$ - <br />$ - <br />$ - <br />$ 26,380 <br />2.6 Permitting <br />$ 1,950 <br />$ - <br />$ - <br />$ - <br />$ - <br />$ 1,950 <br />Lump Sum Total <br />$ 45,620 <br />$ 168,800 <br />$ 2,000 <br />$ 2,000 <br />$ 8,000 <br />$226,420 <br />*Expenses will be invoiced as incurred, not on a lump sum basis. <br />Lump sum fees will be invoiced twice monthly based upon the overall percentage of <br />services completed. Payment will be due per the contract terms. <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project but may <br />be required depending on circumstances that may arise during the execution of this <br />project. Additional services may include, but not be limited to the following: <br />• Environmental Services (surface water impacts, gopher tortoise relocation, etc.) <br />• Construction Services <br />• Design of the RNG or evaporation system projects <br />• Design of any dehydration equipment or chiller skid slab <br />Page 7 of 8 <br />