Laserfiche WebLink
Bid Number 2022009 <br />Addendum No. 3 <br />Page 2 of 2 <br />QUESTIONS: <br />QUESTION: I know that the contractor is responsible for the moving, storage and replacement of the <br />existing furniture in the rooms, will we be able to use one of the larger meeting rooms to store this furniture <br />and keep it in a climate -controlled atmosphere? If not, then will there be a location that we can designate <br />to put climate -controlled units with electric available? <br />ANSWER: We are not requiring a climate -controlled atmosphere for storage. Storage must be clean and <br />dry, to protect contents from elements. Furnishing must be cleaned prior to placing back into finished <br />Villa room. <br />Attachments: <br />Revised Plan Set Sheets A-2 thru A-5 labeled "Addendum #3, dated 9/22/2021" <br />Revised Mechanical Plan Sheets ME -1 through ME -4 labeled "Addendum #3, dated 9/21/2021" <br />Page #4 of Asbestos Identification Survey (Appendix C) dated 7/19/2021 <br />Itemized Bid Schedule "Addendum #3, dated 9/23/2021" <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1914A - Jackie Robinson Training Center - Villas Remodel\1-Admin\Bids\Bid Documents\Bid Docs <br />