My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-171
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 10:39:55 AM
Creation date
11/12/2021 2:35:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/2021
Control Number
2021-171
Agenda Item Number
8.G.
Entity Name
Jackie Robinson Training Complex
Subject
Villas Remodel - Contract Documents and Specifications
Project Number
IRC 1914A
Bid Number
2022009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* ADDENDUM #3 9-22-21 <br />ITEMIZED BID SCHEDULE <br />PROJECT NAME: JACKIE ROBINSON TRAINING COMPLEX - VILLAS REMODEL <br />PROJECT NO. IRC -1914A BID NO. 2022009 <br />BIDDER'S NAME <br />00310-3 <br />7einina 1 <br />MOBILIZATION - FOR CONTRACTS OF 120 CONTRACT <br />DAYS DURATION OR LESS, PARTIAL PAYMENT WILL BE <br />MADE AT 50% OF THE BID PRICE PER MONTH FOR THE <br />FIRST TWO MONTHS. FOR CONTRACTS IN EXCESS OF <br />120 CONTRACT DAYS DURATION, PARTIAL PAYMENT <br />WILL BE MADE AT 25% OF THE BID PRICE PER MONTH <br />FOR THE FIRST FOUR MONTHS. IN NO EVENT SHALL <br />MORE THAN 50% OF THE BID PRICE BE PAID PRIOR TO <br />1 <br />ICOMMENCING CONSTRUCTION ON THE PROJECT SITE <br />LS <br />1 <br />2 <br />PUBLIC CONSTRUCTION BOND <br />LS <br />1 <br />REMOVE CLEAN, AND REINSTALL EXISTING FURNITURE, <br />3 <br />PROVIDE STORAGE AS NECESSARY <br />LS <br />1 <br />325 SF VILLA ROOM REMODEL - WORK INCLUDES <br />CLEANING OF ALL HARD SURFACES, REMOVAL OF <br />CARPET AND TILE IN LIVING AREA, FURNISH AND <br />INSTALL LVT FLOORING, REMOVE AND REPLACE ANY <br />MOLD OR WATER DAMAGED DRYWALL CEILINGS AND <br />WALLS, AS INDICATED ON PLANS, PAINTING OF ALL <br />4 <br />WALLS, AND TEXTURING OF MAIN AREA CEILING <br />EA <br />2 <br />400 SF VILLA ROOM REMODEL - WORK INCLUDES <br />CLEANING OF ALL HARD SURFACES, REMOVAL OF <br />CARPET AND TILE IN LIVING AREA, FURNISH AND <br />INSTALL LVT FLOORING, CUT EXISTING BULKLHEADS <br />DOWN TO 8" BELOW CEILING, REMOVE AND REPLACE <br />ANY MOLD OR WATER DAMAGED DRYWALL CEILINGS <br />AND WALLS, AS INDICATED ON PLANS, PAINTING OF ALL <br />5 <br />IWALLS, AND TEXTURING OF MAIN AREA CEILING <br />EA <br />48 <br />620 SF VILLA SUITE REMODEL - WORK INCLUDES <br />CLEANING OF ALL HARD SURFACES, REMOVAL OF <br />CARPET AND TILE IN LIVING AREA AND BEDROOM, <br />FURNISH AND INSTALL LVT FLOORING, CUT EXISTING <br />BULKLHEADS DOWN TO 8" BELOW CEILING, REMOVE <br />AND REPLACE ANY MOLD OR WATER DAMAGED <br />DRYWALL CEILINGS AND WALLS, AS INDICATED ON <br />PLANS, PAINTING OF ALL WALLS, AND TEXTURING OF <br />6 <br />IMAIN LIVING AREAAND BEDROOM CEILING <br />EA <br />7 <br />7 <br />WINDOWS 6'-2" X 4'-0" <br />EA <br />90 <br />8 <br />EXHAUST FAN <br />EA, <br />52 <br />9 <br />EXTERIOR DOOR WEATHER STRIPPING <br />EA <br />57 <br />REPAIR CRACKED AND SPALLED STUCCO AT DOOR <br />10 <br />THRESHOLDS <br />EA <br />20 <br />REPAIR RUSTESTED TAPCON SCREWS IN EXTERIOR <br />11 <br />DOOR FRAMES <br />PR <br />50 <br />REPLACE RUSTED FASTENERS AT DOOR CLOSERS <br />12 <br />WITH STAINLESS STEEL HARDWARE <br />EA <br />10 <br />13 <br />INSULATION BAFFLES <br />EA <br />667 <br />14 <br />SOFFIT VENTS <br />EA <br />667 <br />00310-3 <br />7einina 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.