Laserfiche WebLink
* ADDENDUM #3 9-22-21 <br />ITEMIZED BID SCHEDULE <br />PROJECT NAME: JACKIE ROBINSON TRAINING COMPLEX - VILLAS REMODEL <br />PROJECT NO. IRC -1914A BID NO. 2022009 <br />BIDDER'S NAME <br />15 <br />Ma <br />ATTIC ACCESS HATCH <br />EA <br />55 <br />16 <br />ABANDONED A/C DUCT WORK (REMOVE) <br />PR <br />44 <br />17 <br />BLOWN IN INSULATION (R-27) IN ALL VILLA BUILDINGS <br />LS <br />1 <br />18 <br />REMOVE A/C REGISTERS AND PATCH CEILING <br />EA <br />110 <br />19 <br />REMOVE EXISITNG T-111 SIDING FROM BELOW FRONT <br />WINDOW, INSTALL INSULATION AND PROVIDE NEW <br />IVAPOR BARRIER <br />EA <br />87 <br />20 <br />RECUALK EXISTING BATHROOM WINDOWS <br />EA <br />87 <br />21 <br />REPAIR SPALLED STUCCO AND CONCRETE AT <br />THRESHOLD <br />EA <br />20 <br />JRTC VILLAS REMODEL SUB -TOTAL <br />FORCE ACCOUNT <br />$300,000.00 <br />TOTAL BID AMOUNT INCLUDING FORCE ACCOUNT TOTAL <br />TOTAL PROJECT BID AMOUNT IN WORD <br />SF = Square Foot LS = Lump Sum EA = Each PR = Per Room <br />AL I tKNATE A ASBESTOS ABATEMENT <br />.. . # V <br />gm. � S""NO " " <br />f3ua Amourel <br />REMOVE ASBESTOS CONTAINING POPCORN CEILING - <br />1A 325 SF ROOM PR 10 <br />REMOVE ASBESTOS CONTAINING POPCORN CEILING - <br />2A 400 SF ROOM PR 67 <br />3A 1REMOVE ASBESTOS CONTAINING POPCORN CEILING - <br />620 SF ROOM PR 10 <br />SUB -TOTAL <br />TOTAL OPTIONAL/ALTERNATE BID <br />ML I MMMA I e rs AbMt:b l UJ tNGANSULATION <br />APPLY SPECIAL PAINT TO ENCAPSULATE ASBESTOS <br />1A CONTAINING POPCORN CEILING - 325 SF ROOM PR 10 <br />APPLY SPECIAL PAINT TO ENCAPSULATE ASBESTOS <br />ASBESTOS CONTAINING POPCORN CEILING - 400 SF <br />2A ROOM PR 67 <br />APPLY SPECIAL PAINT TO ENCAPSULATE <br />ASBESTOSASBESTOS CONTAINING POPCORN CEILING <br />3A 620 SF ROOM DD •n <br />SUB -TOT <br />TOTAL OPTIO <br />00310.4 <br />