Laserfiche WebLink
� ® s <br />3. Land Development Permits Staff <br />4. Final PD (plat) BCC <br />The applicant has applied for conceptual and preliminary plan <br />approval. <br />Pursuant to Section 971.05 of the LDRs, the Board of County <br />Commissioners is to consider the appropriateness of the PD plan <br />special exception request based on the submitted conceptual PD plan <br />and the suitability of the site for the proposed project. The <br />Board may approve, approve with conditions or deny the conceptual <br />special exception PD plan. The Board may attach any conditions and <br />safeguards necessary to mitigate impacts and to ensure <br />compatibility of the use with the surrounding area. <br />At its June 8, 1995 meeting, the Planning and Zoning Commission <br />voted 6 to 1 to grant preliminary PD plan approval and to recommend <br />that the Board grant PD special- exception approval for Lago Rey. <br />If the Board of County Commissioners grants conceptual PD special <br />exception approval, the preliminary PD plan approval will <br />automatically become effective. <br />ANALYSIS: <br />1. Zoning Classification: RS -11 Residential Single Family <br />District (up to 1 unit per acre) <br />2. Land Use Designation: R, Rural (up to 1 unit per acre) <br />3. Size: 39.00016 acres (gross size, prior to 58th Avenue right- <br />of-way donation) <br />4. Density: 0.9999 units per acre (gross density, prior to 58th <br />Avenue right-of-way donation) <br />5. Utilities: In accordance with the requirements of the <br />county's Utility Connection Matrix, this project will connect <br />to public water and wastewater facilities which will be <br />provided by the Indian River County Department of Utility <br />Services. <br />6. Traffic Circulation: The proposed development will be <br />accessed from 58th Avenue by a subdivision access road which <br />will branch into two cul-de-sacs. These cul-de-sacs will <br />provide access to all of the proposed lots. The traffic <br />circulation plan has been reviewed and approved by the <br />county's traffic engineering division. Given the proposed low <br />density, and the fact that adjacent parcels have an <br />agricultural land use designation, no emergency access point <br />nor an interconnection to adjacent undeveloped parcels is <br />required. <br />Although not required by the LDRs, the applicant is currently <br />proposing to provide a northbound, left -turn lane on 58th <br />Avenue at the project entrance. The specifications for any <br />such turn lane will be reviewed during the land.development <br />permit process. <br />7. Stormwater Management: The conceptual stormwater management <br />plan has been approved by the Public Works Department. As <br />required by the LDRs, a Type "B" stormwater management permit <br />must be obtained by the applicant prior to the issuance of a <br />land development permit. <br />AUGUST 15, 1995 7 IBX . oa <br />