My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-199
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:38:46 PM
Creation date
12/17/2021 1:49:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/07/2021
Control Number
2021-199
Agenda Item Number
8.U.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Work Order No. 7 at Hobart Reverse Osmosis Water Treatment Plant
Supervisory Control and Data Acquisition (SCADA) System Upgrades
Bid Number
RFQ2019070
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will review Contractor's monthly applications for payment. <br />Consultant will attend up to three (3) progress meetings on-site. <br />Consultant will assist the Owner with closeout documentation review prior to <br />completion of the project. <br />TASK 2 - PROGRAMMING AND INTEGRATION <br />Consultant will review and completely vet the current HMI migration to <br />VTScada. <br />Consultant will modify the main PLC panel to remove the ControlNet modules, <br />one IA16 module and one ENBT, relocate the two EN2T modules in the CPU <br />rack and modify all programming to correct the current configuration to ethernet <br />communications from the CPU rack to the local RIO rack. <br />Consultant will migrate North Beach communications from North Pump Station <br />PLC to direct via Red Lion converter at each end to provide data direct to/from <br />the HMI I/O server. <br />Consultant will install a new ControlLogix PLC rack with two EN2T modules, <br />CLX, and a network switch for the RIO -LAN subnet provided by the contractor. <br />Consultant will prepare a new CLX program ready for ControlLogix I/O after <br />the conversion, with the possibility of using an additional DHRIO to <br />communicate with the PLC5 I/O. <br />Once Contractor completes HSP PLC5 I/O to ControlLogix I/O upgrade, <br />Consultant will work with the contractor and complete programming check and <br />migration with new I/O. <br />After I/O and control have been migrated above, Consultant will remove the <br />DL4500 DH+ to Ethernet converter used for VTScada. <br />Consultant will remove the existing PLC5 hardware and finalize all <br />communications to VTScada, test and verify functionality. <br />Contractor will upgrade remaining 3 PLC5 RIO Panels to use ControlLogix RIO. <br />Consultant will modify the PLC program for the new CLX I/O, test and verify <br />functionality. CSD will modify the VTScada database for any I/O tags that may <br />have changed and verify functionality. <br />K:\WPB_Civil\General\Black\Florida\IRCU\Hobart PLC\20211118 - Scope - Hobart PLC Construction.docx Page 2 of 5 <br />