My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-199
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:38:46 PM
Creation date
12/17/2021 1:49:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/07/2021
Control Number
2021-199
Agenda Item Number
8.U.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Work Order No. 7 at Hobart Reverse Osmosis Water Treatment Plant
Supervisory Control and Data Acquisition (SCADA) System Upgrades
Bid Number
RFQ2019070
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, <br />but may be required depending on circumstances that may arise during the <br />execution of this project. Additional services include, but may not be limited to <br />the following: <br />Radio survey <br />Purchase/ installation of PLC hardware, panels, electrical components, etc. <br />ITEMS FURNISHED BY OWNER <br />The following items will be furnished by the Owner and are necessary for <br />completion of the tasks described herein. <br />• Access to WTP site <br />• Panel record drawings <br />• Coordination during programming and integration <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Consulting <br />Engineering Services Agreement for Professional Services dated April 17`th, 2018, <br />by and between INDIAN RIVER COUNTY, a political subdivision of the State of <br />Florida ("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services for a lump sum fee as follows: <br />Task No. Task Task Fee <br />Task 1 Update report and Network Diagram $ 18,650 <br />Task 2 Design Phase $ 236,568 <br />TOTAL LUMP SUM FEE $ 255,219 <br />K:\WPB_Civil\General\Black\Florida\IRCU\Hobart PLC\20211118 - Scope - Hobart PLC Construction.docx Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.