My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-199
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:38:46 PM
Creation date
12/17/2021 1:49:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/07/2021
Control Number
2021-199
Agenda Item Number
8.U.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Work Order No. 7 at Hobart Reverse Osmosis Water Treatment Plant
Supervisory Control and Data Acquisition (SCADA) System Upgrades
Bid Number
RFQ2019070
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C & W engineering, Inc <br />Electrical Consultants <br />6903 Vista Parkway North, #10 <br />West Palm Beach, FL 33411 <br />(561) 642-5333 <br />February 18, 2021 <br />Nick Black, P.E. <br />Kimley Horn & Associates <br />1920 Wekiva Way <br />Suite 200 <br />West Palm Beach, FL 33411 <br />Subject: IRC Hobart WTP Electrical PLC-SCADA Improvements Construction <br />Services Proposal <br />C&W Ref. 66437.CS <br />Dear Nick: <br />I am pleased to submit this proposal for your consideration to provide Electrical <br />Engineering Services during the construction phase of the PLC improvements to the <br />Hobart WTP. Below is a summary of our tasks during construction. <br />1. Attend a Pre -construction meeting and respond to questions. <br />2. Review shop drawings. <br />3. Respond to Contractor RFls. <br />4. Provide a field progress observation to the site during different phases <br />of construction, provide a report for each visit. Total of 3. <br />5. Attend the startup of RIO 5 PLC and Plant site Pump Station Panel <br />when these get upgraded with the PLC Kit. <br />6. Attend the startup of one MOV at the south process area (Trains 1 <br />through 4) and one MOV at the north process area (Trains 5 through 8) <br />7. Attend 3 VIRTUAL monthly meetings during construction. <br />8. Review O&M manuals. <br />9. Provide as -built drawings based on Contractor provided redlines. <br />CONSTRUCTION SERVICES <br />Coordination <br />Kimley Horn and Associates <br />Owner <br />CSD personnel <br />Contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.