Laserfiche WebLink
C & W engineering, Inc <br />Electrical Consultants <br />6903 Vista Parkway North, #10 <br />West Palm Beach, FL 33411 <br />(561) 642-5333 <br />February 18, 2021 <br />Nick Black, P.E. <br />Kimley Horn & Associates <br />1920 Wekiva Way <br />Suite 200 <br />West Palm Beach, FL 33411 <br />Subject: IRC Hobart WTP Electrical PLC-SCADA Improvements Construction <br />Services Proposal <br />C&W Ref. 66437.CS <br />Dear Nick: <br />I am pleased to submit this proposal for your consideration to provide Electrical <br />Engineering Services during the construction phase of the PLC improvements to the <br />Hobart WTP. Below is a summary of our tasks during construction. <br />1. Attend a Pre -construction meeting and respond to questions. <br />2. Review shop drawings. <br />3. Respond to Contractor RFls. <br />4. Provide a field progress observation to the site during different phases <br />of construction, provide a report for each visit. Total of 3. <br />5. Attend the startup of RIO 5 PLC and Plant site Pump Station Panel <br />when these get upgraded with the PLC Kit. <br />6. Attend the startup of one MOV at the south process area (Trains 1 <br />through 4) and one MOV at the north process area (Trains 5 through 8) <br />7. Attend 3 VIRTUAL monthly meetings during construction. <br />8. Review O&M manuals. <br />9. Provide as -built drawings based on Contractor provided redlines. <br />CONSTRUCTION SERVICES <br />Coordination <br />Kimley Horn and Associates <br />Owner <br />CSD personnel <br />Contractor <br />