My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-199
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:38:46 PM
Creation date
12/17/2021 1:49:54 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&W REF 66437.CS <br />Attend 3 VIRTUAL Progress Monthly Meetings <br />Progress field inspections during construction total of 3 <br />Review Electrical Equipment shop drawings <br />Review PLC and Control Panel instrumentation shop drawings <br />Prepare response to Contractor RFI requests <br />Attend a startup and testing field visit and provide a punch list to the <br />inspected PLC and upgrade work, including the MOV valves changed out <br />to hard wired controls. <br />Provide review of O&M manuals and confirm spare parts. <br />Provide as -built drawings based on redlines form the Contractor. <br />ELECTRICAL CONSTRUCTION SERVICES PHASE FEE: $7,500 lump sum <br />I trust the scope and fee are in agreement with your needs and expectations. <br />Please contact me with questions or comments. Thanks for this opportunity. <br />Very truly yours, <br />C&W Engineering, Inc. <br />Michael A. Guida, PE <br />JLR/nl <br />
The URL can be used to link to this page
Your browser does not support the video tag.