My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-199
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:38:46 PM
Creation date
12/17/2021 1:49:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/07/2021
Control Number
2021-199
Agenda Item Number
8.U.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Work Order No. 7 at Hobart Reverse Osmosis Water Treatment Plant
Supervisory Control and Data Acquisition (SCADA) System Upgrades
Bid Number
RFQ2019070
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ 224.100.00 <br />$135.00 <br />IRC - Hobart Scada Upgrade Summary of Tasks Versus Cost and Time as of 2/19/2021- Page 1 of 1 <br />LABOR ESTIMATE <br />TASK <br />SCOPE DESCRIPTION <br />CSD <br />CSD Manhour Estimate <br />PROGRAMMING <br />CSD will review and completely vet the <br />current HMI migration to VTScada. <br />CSD will modify the main PLC panel to <br />remove the ControlNet modules, one <br />IA16 module and one ENBT, relocate the <br />two EN2T modules in the CPU rack and <br />modify all programming to correct the <br />1 <br />current configuration to ethernet <br />160 <br />$ 21,600.00 <br />communications from the CPU rack to <br />the local RIO rack. <br />CSD will migrate North Beach <br />communications from North Pump <br />Station PLC to direct via Red Lion <br />converter at each end to provide data <br />direct to/from the HMI 1/0 server. <br />CSD will install a new ControlLogix PLC <br />rack with two EN2T modules, CLX, and a <br />network switch for the RIO—LAN subnet <br />provided by the contractor. <br />2 <br />Have a new CLX program ready for <br />240 <br />$ 32,400.00 <br />ControlLogix 1/O after the conversion, <br />with the possibility of using an additiona <br />DHRIO to communicate with the PLCS <br />11/0. <br />Contractor to upgrade HSP PLC51/0 to <br />ControlLogix 1/0 and CSD will work with <br />3 <br />the contractor and complete <br />240 <br />$ 32,4DO.00 <br />programming check and migration with <br />new 1/0. <br />After I/O and control have been <br />migrated above, CSD removes the <br />DL4500 DH+to Ethernet converter used <br />for VTScada. <br />4 <br />80 <br />$ 10,800.00 <br />CSD will remove the existing PLCS <br />hardware and finalize all <br />communications to VTScada, test and <br />Iverifv functionality. <br />Contractor will upgrade remaining 3 <br />PLCS RIO Panels to use ControlLogix RIO. <br />CSD will modify the PLC program for the <br />5 <br />new CLX 1/0, test and verify <br />320 <br />$ 43,200.00 <br />functionality. CSDwill modify the <br />VrScada database for any 1/0 tags that <br />may have changed and verify <br />functional' <br />PLC Panel Completion. CSD will remove <br />6 <br />DHRIO modules from the configuration. <br />80 <br />$ 10,800.00 <br />Contractor will perform a radio survey to <br />provide ethernet radio connectivity from <br />North Beach to the WTP. <br />7 <br />120 <br />$ 16,200.00 <br />Contractor will upgrade RIO racks and <br />work with CSD to upgrade North Beach <br />to Com actLo 'x PLC. <br />CSD will install a new L72 PLC in the main <br />PLC panel at a later version of Studio <br />5000 to be determined. <br />The existing warm back up rack will be <br />8 <br />either removed or have a second L72 <br />160 <br />$ 21,600.00 <br />CPU installed. <br />CSD will provide any further <br />programming on various systems, <br />startup all systems together and finalize <br />the entire system. <br />Replace Rotork Pakscan communication <br />network. Contractor will install option <br />cards in all of the Rotork actuators which <br />will allow the valves to be controlled via <br />a 4-20ma signal. Contractor and CSD will <br />9 <br />add any additional analog 1/O, if needed, <br />160 <br />$ 21,600.00 <br />and CSD will modify the PLC program to <br />use analog 1/0 for control. CSD will <br />make any updates needed in the <br />VTScada database. Test and verify <br />functionality. <br />Revamp the Lime Slurry panel PLC from <br />the existing MicroLogix to ComrolLogix <br />10 <br />remote 1/O and incorporate into the <br />100 <br />$ 13,500.00 <br />main PLC program. Test and verify <br />operation. <br />$ 224.100.00 <br />$135.00 <br />IRC - Hobart Scada Upgrade Summary of Tasks Versus Cost and Time as of 2/19/2021- Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.