$ 224.100.00 <br />$135.00 <br />IRC - Hobart Scada Upgrade Summary of Tasks Versus Cost and Time as of 2/19/2021- Page 1 of 1 <br />LABOR ESTIMATE <br />TASK <br />SCOPE DESCRIPTION <br />CSD <br />CSD Manhour Estimate <br />PROGRAMMING <br />CSD will review and completely vet the <br />current HMI migration to VTScada. <br />CSD will modify the main PLC panel to <br />remove the ControlNet modules, one <br />IA16 module and one ENBT, relocate the <br />two EN2T modules in the CPU rack and <br />modify all programming to correct the <br />1 <br />current configuration to ethernet <br />160 <br />$ 21,600.00 <br />communications from the CPU rack to <br />the local RIO rack. <br />CSD will migrate North Beach <br />communications from North Pump <br />Station PLC to direct via Red Lion <br />converter at each end to provide data <br />direct to/from the HMI 1/0 server. <br />CSD will install a new ControlLogix PLC <br />rack with two EN2T modules, CLX, and a <br />network switch for the RIO—LAN subnet <br />provided by the contractor. <br />2 <br />Have a new CLX program ready for <br />240 <br />$ 32,400.00 <br />ControlLogix 1/O after the conversion, <br />with the possibility of using an additiona <br />DHRIO to communicate with the PLCS <br />11/0. <br />Contractor to upgrade HSP PLC51/0 to <br />ControlLogix 1/0 and CSD will work with <br />3 <br />the contractor and complete <br />240 <br />$ 32,4DO.00 <br />programming check and migration with <br />new 1/0. <br />After I/O and control have been <br />migrated above, CSD removes the <br />DL4500 DH+to Ethernet converter used <br />for VTScada. <br />4 <br />80 <br />$ 10,800.00 <br />CSD will remove the existing PLCS <br />hardware and finalize all <br />communications to VTScada, test and <br />Iverifv functionality. <br />Contractor will upgrade remaining 3 <br />PLCS RIO Panels to use ControlLogix RIO. <br />CSD will modify the PLC program for the <br />5 <br />new CLX 1/0, test and verify <br />320 <br />$ 43,200.00 <br />functionality. CSDwill modify the <br />VrScada database for any 1/0 tags that <br />may have changed and verify <br />functional' <br />PLC Panel Completion. CSD will remove <br />6 <br />DHRIO modules from the configuration. <br />80 <br />$ 10,800.00 <br />Contractor will perform a radio survey to <br />provide ethernet radio connectivity from <br />North Beach to the WTP. <br />7 <br />120 <br />$ 16,200.00 <br />Contractor will upgrade RIO racks and <br />work with CSD to upgrade North Beach <br />to Com actLo 'x PLC. <br />CSD will install a new L72 PLC in the main <br />PLC panel at a later version of Studio <br />5000 to be determined. <br />The existing warm back up rack will be <br />8 <br />either removed or have a second L72 <br />160 <br />$ 21,600.00 <br />CPU installed. <br />CSD will provide any further <br />programming on various systems, <br />startup all systems together and finalize <br />the entire system. <br />Replace Rotork Pakscan communication <br />network. Contractor will install option <br />cards in all of the Rotork actuators which <br />will allow the valves to be controlled via <br />a 4-20ma signal. Contractor and CSD will <br />9 <br />add any additional analog 1/O, if needed, <br />160 <br />$ 21,600.00 <br />and CSD will modify the PLC program to <br />use analog 1/0 for control. CSD will <br />make any updates needed in the <br />VTScada database. Test and verify <br />functionality. <br />Revamp the Lime Slurry panel PLC from <br />the existing MicroLogix to ComrolLogix <br />10 <br />remote 1/O and incorporate into the <br />100 <br />$ 13,500.00 <br />main PLC program. Test and verify <br />operation. <br />$ 224.100.00 <br />$135.00 <br />IRC - Hobart Scada Upgrade Summary of Tasks Versus Cost and Time as of 2/19/2021- Page 1 of 1 <br />