My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-200
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:36:41 PM
Creation date
12/17/2021 2:05:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/07/2021
Control Number
2021-200
Agenda Item Number
8.V.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 48, 43rd Avenue & South Relief Canal
18” Water Main Relocation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK ORDER NUMBER 48 <br />43rd AVENUE UTILITY RELOCATION PROJECT <br />This Work Order Number 48 is entered into as of this L day of Decembez 2021, pursuant to <br />that certain Continuing Contract Agreement for Continuing Engineering Services, dated April 17, <br />2018, renewed and amended as of May 18, 2021 (collectively referred to as the "Agreement"), by and <br />between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and <br />KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). <br />The COUNTY has selected the Consultant to perform the professional services set forth on <br />Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The <br />professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B <br />(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The <br />Consultant will perform the professional services within the timeframe more particularly set forth in <br />Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by this reference all in <br />accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of <br />the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement <br />and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as <br />if fully set forth herein. <br />EXHIBIT A— SCOPE OF WORK <br />43rdAvenue Utilitv Relocation Pro <br />In conjunction with the County's desire to replace the existing vehicular bridge on 43rd Avenue <br />over the Indian River Farms Water Control District (IRFWCD) South Relief Canal, the County <br />desires to relocate the existing 18" water main to accommodate the proposed replacement <br />structure. Presently, the existing water main is aerially supported along the east side of the <br />existing structure, the proposed structure is shown to have a utility shelf along the west side to <br />support the utility relocation. To support the utility relocation, the proposed bridge will need to <br />be phase constructed as to not adversely impact utility service customers. <br />A. Utility Plans: <br />The following is the anticipated utility improvement associated within the project limits: <br />1. The utility plan sheets will be drawn at a scale of 1" = 40' prepared on 11" x 17" sheets. <br />2. All quantities shall reference FDOT Pay Item Numbers. <br />3. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction and/ or Indian River County Utility Standards. Any deviations or special <br />specifications not included in specifications will be provided in the Technical <br />Specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.