Laserfiche WebLink
The proposed utility improvements will be submitted to the COUNTY for review and comment at <br />Preliminary (30%), Constructability (60%), Biddability (90%) and Production (100%) design <br />submittal stages. Review submittals will consist of three (3) hard copies of utility plans along <br />with an opinion of probable construction cost. <br />B. Utility Permit: <br />To support the above described utility improvement, the Consultant will prepare and submit a <br />Florida Department of Environmental Protection (FDEP) Specific Permit to Construct Public <br />Water Systems Components and an IRFWCD Application for Utility Construction Permit. <br />Permit agency coordination assumes one (1) request for additional information (RAI) to be <br />received from FDEP and IRFWCD associated with the applications. The Consultant has included <br />the $650 FDEP application fee within the work order fee. The Final Plans will be provided in <br />Autodesk Civil 3D format. <br />It is anticipated that the utility improvement plans will be submitted to the FDOT to review (4 <br />separate submittal reviews) and approve under the FDOT Electronic Review Comment (ERC) <br />System. <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />