Laserfiche WebLink
Lakes at Waterway Village Plat Pod U <br />FINAL LIFT BOND - OPC <br />9/15/2021 <br />PAVING <br />DESCRIPTION QUANTITY UNIT <br />UNIT COST <br />TOTAL <br />1" ASPHALT (FINAL COURSE) - Pods -S- F 14 3,822 1 Sy 1$ <br />9.78 <br />$ <br />37,379.15 <br />SIGNING AND STRIPING 1 LS <br />$ 2,500.00 <br />$ <br />2,500.00 <br />SET PRM -5, PCP'S, LOT CORNERS 1 I LS <br />$ 8,000.00 <br />$ <br />8,000.00 <br />TOTAL <br />$ <br />47,879.16 <br />TOTALS $ 47,879.15 <br />PROPOSED BOND AMOUNT (125%) $ 59,848.95 <br />Kimley Horn and <br />' ticEn; ' /yCi IRCENGINEERING <br />DIVISJON <br />No. 7548 s Accepted E1 y <br />— a Z Insufficient -- -.- <br />Kinan Husai PT-- <br />FL Reg #75� <br />TSTgT F <br />/ NA <br />l/,iL E <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, <br />bids, or actual construction costs will not vary from its opinions of probable costs. <br />15 <br />