My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1995
CBCC
>
Meetings
>
1990's
>
1995
>
9/5/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:12 PM
Creation date
6/16/2015 2:45:22 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/05/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
station removed from service would be approximately $3,300.00, which <br />equates to a payback period of six years even if salvage value is <br />ignored. This action also removes a potential liability to the <br />Utilities Department. Funding for this project will be from the <br />renewal and replacement fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the developer's agreement as <br />presented. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Tippin, the Board unanimously, by a 4-0 <br />vote (Chairman Macht being absent), approved the <br />Developer's Agreement with Oak Harbor Club <br />Properties, Ltd., as recommended by staff. <br />AGREEMENT IS ON FILE IN THE OFFICE OF THE CLERK <br />TO THE BOARD <br />NORTH BEACH WASTEWATER REPUMP STATION - ADDENDUM <br />NO. 1 TO ENGINEER'S WORK AUTHORIZATION NO. 2 <br />The Board reviewed a Memorandum of August 23, 1995: <br />DATE: AUGUST 23, 1995 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI CES <br />PREPARED WILLIAM F. MCCAIN <br />AND STAFFED CAPITAL PROJECTS ER <br />BY: DEPARTMENT OF UTI ITY SERVICES <br />SUBJECT: NORTH BEACH WASTEWATER REPOMP STATION <br />ADDENDUM NO. 1 TO ENGINEER'S WORK AUTHORIZATION NO. 2 <br />INDIAN RIVER COUNTY PROJECT NO. IIS -94 -22 -CS <br />BACKGROUND <br />On August 8, 1995, the Indian River County Board of County <br />Commissioners approved a change order to the.Jungle Trail water line <br />project for an additional parallel water line. This line is to <br />allow the.North Beach R.O. Plant to be taken off line in the near <br />future. (Please see the attached agenda item, minutes, and letter <br />of recommendation from Brown and Caldwell.) <br />On October il, 1994, the Commission approved a contract with <br />Masteller and Moler for the design of a North Beach Wastewater <br />Repump Station and Force Main over the Wabasso causeway. In keeping <br />with our approved direction to remove the North Beach Water Plant <br />from service, we now wish to continue our water line -extension from <br />Jungle Trail over the causeway to our existing line on CR 510. This <br />line will also provide service to both Marsh and orchid Islands. <br />Since the water line will take the same route as the force main, the <br />County is proposing to amend the existing force main design contract <br />with Masteller and Moler to include the water main design. (Please <br />see attached Work Authorization Addendum.) <br />SEPTEMBER 5, 1995 <br />26 bm 95 uru.. -996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.