My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1995
CBCC
>
Meetings
>
1990's
>
1995
>
9/5/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:12 PM
Creation date
6/16/2015 2:45:22 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/05/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 95 mu 995 <br />The attached Amendment No. 1 provides for the design and permitting of a <br />soutiibound right turn lane off U.S. 1 and modification to the signalization plans. A <br />northbound right turn lane off U.S.1 was included in the original contract. <br />The compensation due the Engineer for Amendment No.1 Is $3,300.00. This added <br />to the c went contract amount of $45,000.00 results in a revised contract amount of <br />$48,300.00 <br />Staff recommends approval of Amendment No.1 to Work Order No.1 In the amount <br />of $3,300.00. Funding is from Account 101-153-541-067.36 and 101-154-541- <br />067.36. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bird, the Board unanimously, by a 4-0 <br />vote (Chairman Macht being absent), approved <br />Amendment No. 1 to Work Order No. 1 in the amount of <br />$3,300 to Kimley-Horn and Associates, Inc., as <br />recommended by staff. <br />AMENDMENT IS ON FILE IN THE OFFICE OF THE CLERK <br />TO THE BOARD <br />OAK HARBOR PHASE I - DEVELOPER'S AGREEMENT <br />The Board reviewed a Memorandum of August 9, 1995: <br />DATE: AUGUST 9, 1995 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF ILI ERVICES <br />PREPARED WILLIAM F. CAIN <br />AND STAFFED CAPITAL P INEER <br />BY: DEPART ILITY SERVICES <br />SUBJECT: OAK HARBOR PHASE I - DEVELOPER'S AGREEMENT <br />INDIAN RIVER COUNTY PROJECT NO. CDS/CCS-515 <br />BACKGROUND <br />As a result of review of this proposed development with the design <br />engineer, we have determined that an existing County lift station <br />within Grand Harbor can be abandoned and its flow diverted into the <br />collection system of the Oak Harbor Phase I development. We feel <br />that this abandonment will be advantageous to both the County and <br />the developer. <br />ANALYSIS <br />The total cost of the above work is $40,000.00. Of that amount, the <br />County is proposing to reimburse $20,000.00 to the developer.-- The <br />valve of the pumps and other equipment to be removed from the pump <br />station and used elsewhere at a future date is in excess of <br />$20,000.00. The cost savings per year to the County with this <br />SEPTEMBER 5, 1995 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.