My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/09/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
11/09/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 11:03:54 AM
Creation date
1/25/2022 10:32:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/09/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BYERS !ndian River County Implementation <br />ENGINEERING <br />COMPANY .._...._. _ _ .._.. <br />■ Owned % values <br />o Creating Equipment Location features (Fiber Termination Location) with following <br />attributes. <br />■ Site Identification Name <br />o Import Fiber Devices inti Traffic Cabinets and Equipment Locations (Buildings) with <br />following attriButes. <br />■ Comments (Common Name) <br />■ Manufacture <br />■ Model (If available) <br />■ Fiber Mode <br />■ IP Address (If available)_ <br />■ Trunk Ports <br />o Attachment of digital pictures for: <br />■ Conduit Access Points <br />■ Cabinets <br />■ Equipment Locations <br />o Creating Building Footprints <br />o Creating Racks and mounting fiber devices and attaching pictures. <br />Step 4 —Build Splice Connectivity in NexusWOrx. <br />Upon completion of splice verification by QC's vendor and providing data that aligns with Byers needs a <br />NexusWorx data technician will utilize the field verified splice data and our ISP connectivity data to build <br />fiber strand and/or port connectivity in NexusWorx. <br />Byers will need to work with IRC to define a Fiber Path naming convention that will be utilized. <br />4. ASSUMPTIONS <br />The following are the assumptions regarding each phase. <br />Step 1— GIS Data Update — <br />• This will be a cross compare to the initial migrated GIS database, and we'll upload into <br />NexusWorx any new features in GIS, not in the initial data load or removed from the county's GIS <br />as long as the removal appears logical. This is only for the Phase 3 area. <br />• We expect the delta between these data sets is expected to be less than 5%. <br />• Below are the rules utilized in the initial migration and the same applies for the update: <br />o Fibers will be loaded only from County Fiber Optic Cable feature class since this <br />contains all of the consortium fibers. <br />o Fiber Optic Cable feature class contains Copper cables and Conduits which will be <br />extracted and loaded into Copper Cable and Conduit Duct Bank features. <br />o The County Handhole feature class contains, in addition to Handholes, Patch Panel, <br />Traffic Cabinets, and Splice Closure locations. Only Handholes, Traffic Cabinets, and <br />Splice Locations will be loaded with these features. <br />o Fiber Termination or Building locations will be generated from Fiber Building feature <br />class. <br />o Byers will add new attributes to capture percentage ownership. <br />o All data appears to geographically accurate so that no updates will be performed on these <br />features. Fiber cables may be offset to the structures or conduit running line. <br />Step 2 — OSP/ISP Field Inventory & NexusWorx Update <br />• No Manholes exist or any underground structure is requiring mechanical pumping or ventilatior-. <br />Copyright © 2019- Byers Engineering Company, Atlanta GA - All rights reserved 7 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.