My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-008
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:31:19 AM
Creation date
2/4/2022 10:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/11/2022
Control Number
2022-008
Agenda Item Number
8.M.
Entity Name
Edlund, Dritenbas, Binkley Architects and Associates, P.A.
Subject
Work Order No. 5 for Architectural/Engineering Services for
Fire Station #7, #05219VB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. John Binkley <br />November 11, 2021 <br />Page 4 <br />Proposal: 21-0492 <br />i. SJRWMD Environmental Resource Permit <br />j. FDEP Water Distribution <br />k. FDEP Wastewater Collection <br />1. FDEP NPDES Notice of Intent <br />13. Submission of civil plans and application packages to permit agencies. <br />14. Attendance at the COF Technical Review Committee meeting. <br />15. Final construction plans drawings revisions per jurisdictional comments and resubmittal to <br />agencies for final approvals. <br />16. Attendance to the COF Planning and Zoning Commission Meeting. <br />17. Attendance to the COF City Council Meeting. <br />Task 3 — Off -Site Civil Design & Permitting (CIV -3) <br />This task includes the services associated with the off-site roadway and utilities design and <br />permitting services required for the proposed off-site improvements associated with the project. <br />1. Project coordination with the following regulatory agencies: <br />a. Indian River County (IRC) <br />b. Indian River Farms Water Control District (IRFWCD) <br />C. Sebastian River Improvement District (SRID) <br />d. St. John's River Water Management District (SJRWMD) <br />e. Florida Department of Environmental Protection (FDEP) <br />2. Project coordination and review of the required off-site route survey. It is understood that <br />the off-site route survey will be contracted by Client and provided by others to 14iBV in <br />both CAD and hard copy formas to be utilized in the design of the project. The cost of <br />survey work has not been included in this proposal. <br />3. Project coordination and evaluation of the subsurface soils investigation for the roadway <br />improvements. It is understood that the soils investigation will be contracted by Client and <br />provided to MBV. No cost of geotech work is included in this proposal. <br />4. Development of the off-site stormwater calculations and report for the 98th Avenue <br />roadway extension. It is understood this roadway's impervious area was included in the <br />previously approved CVS Distribution Center's stormwater calculations and permits and <br />that the drainage report will not require new or additional ICPR stormwater modeling and <br />is therefore not included in this proposal. <br />5. Design of the off-site water and sewer utilities. We understand water and sewer are not <br />available adjacent to the site and that off-site utility extensions will be required as part of <br />this project. We understand the water main will need to be extended from the existing 8" <br />water main valve located in the 98th Avenue east ROW at the corner of 22nd Street, <br />approximately 1,000' to the north to the Fire Station parcel. We also understand the sewer <br />
The URL can be used to link to this page
Your browser does not support the video tag.