My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-008
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:31:19 AM
Creation date
2/4/2022 10:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/11/2022
Control Number
2022-008
Agenda Item Number
8.M.
Entity Name
Edlund, Dritenbas, Binkley Architects and Associates, P.A.
Subject
Work Order No. 5 for Architectural/Engineering Services for
Fire Station #7, #05219VB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. John Binkley <br />November 11, 2021 <br />Page 5 <br />Proposal: 21-0492 <br />force main will extend approximately 3,000' from the parcel to an existing force main <br />valve located adjacent to the CVS lift station pad. <br />6. Design of the roadway paving, grading and drainage system. (Approximately 1,000 LF) <br />7. Development of off-site civil construction plans consisting of: <br />• Existing Conditions Plan <br />• Demolition Plan (as applicable) <br />• Erosion Control Plan and Details <br />• Roadway Design Plan <br />• Paving, Grading and Drainage Plan' <br />• Utility Plan (Water and Sewer) <br />• Sewer Profiles <br />• Paving, Grading and Drainage Details Plans <br />• Utility Details Plan <br />Preparation of the following permit applications: <br />a. IRC Utilities <br />b. IRC Stormwater (Modification o existing CVS permit) <br />C. IRC Right -of -Way <br />d. SJRWMD Environmental Resource Permit (Modification to existing CVS permit) <br />e. FDEP Water Distribution <br />f. FDEP Wastewater Collection <br />g. FDEP NPDES Notice of Intent <br />9. Submission of civil plans and application packages to permit agencies. <br />10. Final Construction plans drawings revisions per jurisdictional comments and resubmittal <br />to agencies for final approvals. <br />Task 4 — Construction Inspection and Certifications (CIV -4) <br />This task includes construction inspections and certifications for both on and off site as required <br />by the local and state regulatory agencies, in addition to the inspections required by the Engineer <br />of Record, to provide final certifications. <br />Utilities: <br />Sewer: Pre -construction meeting, shop drawing review, setting of lift station inspection, force <br />main installation inspections, force main pressure test inspection, lift station start-up <br />inspection, setting of manholes inspections, gravity sewer main installation inspections, as - <br />built review, final certifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.