Laserfiche WebLink
SECTION 01310 <br />CONSTRUCTION SCHEDULES <br />1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br />A. After receiving approval by the ENGINEER, distribute copies of the <br />approved initial schedule and all reviewed revisions (updated) to: <br />1. Job site file. <br />2. Subcontractors. <br />3. Other concerned parties. <br />4. OWNER (two copies). <br />5. ENGINEER <br />B. In the cover letter, instruct ecipients to report promptly to the <br />CONTRACTOR, in writing, any problems anticipated by the projections <br />shown in the schedules. <br />+ + END OF SECTION + + <br />01310-2 01310 Construction Schedule <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\163E 6th Avenue US -1 to 21st Street Resurfacing (SCOP)\1- <br />Admin\Bids\Bid Documents\Master Contract Documents\01 3 10 - Construction Schedule.doc <br />