Laserfiche WebLink
Division 2 - Technical Provisions, IRC -1638 <br />SURVEY CONTROL <br />1. Install/re-establish: It shall be the contractor's responsibility to hire a Professional <br />Surveyor and Mapper as defined per Chapter 472, Florida Statutes, to replace any <br />horizontal and vertical control shown on the engineering plans that was destroyed <br />during construction. <br />2. New roadway alignment control points (survey baseline or controlling line and all points <br />as indicated on the plans or control sheet) upon final roadway completion. Include all <br />intersections and side streets. State plane coordinates and elevations for all control <br />points. <br />3. If shown on plans or not: Any Public Land Corner or Governmental Survey Control <br />point(s), vertical control (bench marks), property corners destroyed and/or disturbed <br />during the scope of the project shall be properly re-established as per standards as set <br />forth within Florida Statutes, Administrative code and Minimum Technical Standards for <br />that type of survey. All said surveying mentioned above shall be performed under the <br />direct supervision of a registered Professional Surveyor and Mapper in the state of <br />Florida and certified accordingly. Said Governmental agency(s) shall be notified in <br />writing of disturbance and re -establishments. <br />RECORD/AS-BUILTS DRAWINGS FORMAT - SUBMITTAL <br />A. ENGINEER will supply the CONTRACTOR with the electronic file of the approved <br />construction plans for the input of the As -Built (record) information. <br />B. CONTRACTOR shall deliver seven (7) certified sets of Record/As-Builts with Electronic <br />Drawing files prepared in AutoCAD Civil 3D 2013 AND PDF format or in current version <br />as agreed by the ENGINEER. <br />C. CONTRACTOR's surveyor shall review, sign and seal As-Builts or Record drawing(s). Said <br />drawing(s) shall clearly state type of survey, positional tolerances, adhere and be <br />certified to by a registered Professional Surveyor and Mapper in the state of Florida, any <br />standards set forth by Florida Statutes, Administrative code and Minimum Technical <br />Standards for As-Built/Record surveys. <br />D. All Record/As-Built drawings are subject to review and approval by County Surveyor. <br />ACCURACY <br />The CONTRACTOR will be held responsible for the accuracy and completeness of Record Drawings <br />and Electronic As-Builts and shall bear any costs incurred in finding utilities as a result of incorrect <br />data furnished by the CONTRACTOR. <br />Division 2 —Technical Provisions - 01025-30 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1638 6th Avenie US -1 to 21st Street Resurfacing (SCOP)\1-Admin\Bids\Bid Documents\DIV 2 TECHNICAL PROVISIONS - <br />20201002.docx <br />