Laserfiche WebLink
Division 2 - Technical Provisions, IRC -1638 <br />COMPLETION OF WORK <br />Upon Substantial Completion of the Work, deliver Record Drawings/As-Built Drawings to ENGINEER. <br />Final payment will not be made until satisfactory record documents are received and approved by <br />ENGINEER. <br />AERIAL PHOTOGRAPH <br />The CONTRACTOR shall provide aerial photographs of the project every 30 days during construction. <br />The photographs shall be done in a manner to show the construction progress for the entire length <br />of the project. The photographs can be angled and not prepared to a particular scale, however, must <br />be detailed enough to identify the work in detail. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 0999 1— As -Built Drawing (By Registered Surveyor) — Per Lump Sum <br />[The remainder of this page was left blank intentionally] <br />Division 2 — Technical Provis ons - 01025-31 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1638 6th Avenue US -1 t:) 21st Street Resurfacing (SCOP)\1-Admin\Bids\Bid Documents\DIV 2 TECHNICAL PROVISIONS - <br />20201002.docx <br />