OHL USA, Inc. - Projects Completed Within Last Five Years
<br />Project Name
<br />Contract Value
<br />Project Owner and Contact
<br />Description
<br />Completion Date
<br />Wilmington Ave. Interchange Modification;
<br />City of Carson
<br />Improvements to the 1-405 and Wilmington Ave.
<br />Carson, CA
<br />$ 28,967,311.83
<br />Raymond Velasco, P.E
<br />Interchange including a new on-ramp to the 1-405,
<br />November 16, 2018
<br />(310)952-1700 Ext 1812
<br />retaining walls, noise walls, widening, retrofitting.
<br />SR55/SR91 Connector; Orange County,
<br />$ 20,235,020.55
<br />Caltrans
<br />Adrian Wu, P.E.
<br />Construction of new lanes, bridge widening,
<br />October 31, 2016
<br />CA
<br />949-279-8488
<br />retainingwalls, excavation.
<br />Magnolia Avenue / BNSF Railway Grade
<br />County of Riverside
<br />Construction of a 1,460 -foot long and 80 -foot wide
<br />Separation; Riverside County, CA
<br />$ 35,632,557.40
<br />Wael Faqih, P.E.
<br />bridge that crosses over an existing BNSF railroad.
<br />September 1, 2016
<br />951-264-2350
<br />Lakeview Avenue Grade Separation;
<br />OCTA
<br />Constructionof a new 252 -foot long precast girder
<br />Orange County, CA
<br />$ 35,036,346.15
<br />Ross Lew
<br />bridge, retaining walls, stone drain/sewer lines, and
<br />May 23, 2017
<br />(714) 560-5775
<br />a ground detention basin.
<br />Union/Patsaouras Plaza Busway Station;
<br />LA METRO
<br />Bridge widening, pedestrian walkways and bridge,
<br />LA County, CA
<br />$ 32,893,069.20
<br />Timothy Lindholm
<br />stairs, elevators, canopy structure with lighting,
<br />December 10, 2020
<br />323-506-8031
<br />signage and wayfinding.
<br />Machado Lake Ecosystem Rehabilitation;
<br />City of Los Angeles
<br />Improvement of water quality by removing
<br />LA County, CA
<br />$ 74,277,419.34
<br />Alvaro Prada
<br />contaminated sediment, installing systems to
<br />June 16, 2018
<br />(714)300-3343
<br />remove pollutants, and new treatment facilities.
<br />Puente Avenue Grade Separation; Los
<br />Alameda Corridor East
<br />Construction of two new bridges, retaining concrete
<br />Angeles County, CA
<br />$ 39,010,606.77
<br />Mark Chrisloffels
<br />walls, pump station, utilities, roadway
<br />July 13, 2018
<br />6269629292
<br />improvements, demolition and grading.
<br />SR101 Pavement Replacement; LA
<br />Caltrans
<br />County, CA
<br />$ 19,678,148.48
<br />Miguel Rodriguez
<br />Pavement replacement on the 101 freeway.
<br />March 21, 2017
<br />213-330-6584
<br />Caltrans
<br />1-40 Six Bridges Replacement; Essex, CA
<br />$ 22,049,894.49
<br />Darcy Davis
<br />Replacement of six bridges over two phases.
<br />June 29, 2017
<br />760-326-4684
<br />Seismic Retrofit &Reconstruction of the La
<br />$ 11,575,000.42
<br />City of Pasadena
<br />Brent Maue
<br />Reconstructing the 103 year old bridge to meet
<br />June 30, 2017
<br />Loma Road Bridge; LA County, CA
<br />626-744-4303
<br />current seismic and structural requirements
<br />Murrieta Creek, Phase 2; Riverside County
<br />$ 17,409,645.93
<br />USACE - LA District
<br />Fernando Cano
<br />Improvements to the 4,300 -foot -long channel,
<br />October 1, 2019
<br />LA
<br />9095789705
<br />including widening and deepening.
<br />Completed Projects Page 1