Laserfiche WebLink
OHL USA, Inc. - Projects Completed Within Last Five Years <br />Project Name <br />Contract Value <br />Project Owner and Contact <br />Description <br />Completion Date <br />Wilmington Ave. Interchange Modification; <br />City of Carson <br />Improvements to the 1-405 and Wilmington Ave. <br />Carson, CA <br />$ 28,967,311.83 <br />Raymond Velasco, P.E <br />Interchange including a new on-ramp to the 1-405, <br />November 16, 2018 <br />(310)952-1700 Ext 1812 <br />retaining walls, noise walls, widening, retrofitting. <br />SR55/SR91 Connector; Orange County, <br />$ 20,235,020.55 <br />Caltrans <br />Adrian Wu, P.E. <br />Construction of new lanes, bridge widening, <br />October 31, 2016 <br />CA <br />949-279-8488 <br />retainingwalls, excavation. <br />Magnolia Avenue / BNSF Railway Grade <br />County of Riverside <br />Construction of a 1,460 -foot long and 80 -foot wide <br />Separation; Riverside County, CA <br />$ 35,632,557.40 <br />Wael Faqih, P.E. <br />bridge that crosses over an existing BNSF railroad. <br />September 1, 2016 <br />951-264-2350 <br />Lakeview Avenue Grade Separation; <br />OCTA <br />Constructionof a new 252 -foot long precast girder <br />Orange County, CA <br />$ 35,036,346.15 <br />Ross Lew <br />bridge, retaining walls, stone drain/sewer lines, and <br />May 23, 2017 <br />(714) 560-5775 <br />a ground detention basin. <br />Union/Patsaouras Plaza Busway Station; <br />LA METRO <br />Bridge widening, pedestrian walkways and bridge, <br />LA County, CA <br />$ 32,893,069.20 <br />Timothy Lindholm <br />stairs, elevators, canopy structure with lighting, <br />December 10, 2020 <br />323-506-8031 <br />signage and wayfinding. <br />Machado Lake Ecosystem Rehabilitation; <br />City of Los Angeles <br />Improvement of water quality by removing <br />LA County, CA <br />$ 74,277,419.34 <br />Alvaro Prada <br />contaminated sediment, installing systems to <br />June 16, 2018 <br />(714)300-3343 <br />remove pollutants, and new treatment facilities. <br />Puente Avenue Grade Separation; Los <br />Alameda Corridor East <br />Construction of two new bridges, retaining concrete <br />Angeles County, CA <br />$ 39,010,606.77 <br />Mark Chrisloffels <br />walls, pump station, utilities, roadway <br />July 13, 2018 <br />6269629292 <br />improvements, demolition and grading. <br />SR101 Pavement Replacement; LA <br />Caltrans <br />County, CA <br />$ 19,678,148.48 <br />Miguel Rodriguez <br />Pavement replacement on the 101 freeway. <br />March 21, 2017 <br />213-330-6584 <br />Caltrans <br />1-40 Six Bridges Replacement; Essex, CA <br />$ 22,049,894.49 <br />Darcy Davis <br />Replacement of six bridges over two phases. <br />June 29, 2017 <br />760-326-4684 <br />Seismic Retrofit &Reconstruction of the La <br />$ 11,575,000.42 <br />City of Pasadena <br />Brent Maue <br />Reconstructing the 103 year old bridge to meet <br />June 30, 2017 <br />Loma Road Bridge; LA County, CA <br />626-744-4303 <br />current seismic and structural requirements <br />Murrieta Creek, Phase 2; Riverside County <br />$ 17,409,645.93 <br />USACE - LA District <br />Fernando Cano <br />Improvements to the 4,300 -foot -long channel, <br />October 1, 2019 <br />LA <br />9095789705 <br />including widening and deepening. <br />Completed Projects Page 1 <br />