OHL USA, Inc. - Projects Completed Within Last Five Years
<br />Project Name
<br />Contract Value
<br />Project Owner and Contact
<br />Description
<br />Completion Date
<br />Palos Verdes Reservior Upgrade; Los
<br />MWD
<br />Replacement of the concrete liner with an asphalt
<br />Angeles County, CA
<br />$ 31,775,845.82
<br />Everitt Mundkowsky
<br />liner overlain by an impermeable geomembrane
<br />July 9, 2019
<br />7144763728
<br />lining system.
<br />Ow
<br />Owens Lake Dust Mitigation -Phase 9/10;
<br />OwCounty,
<br />LADWP
<br />Development of 14 dust -control areas on a 3.6-
<br />Inyo CA
<br />$ 238,255,035.82
<br />Jaime Valenzuela
<br />square -mile portion of a dry lake bed using gravel
<br />December 31, 2017
<br />213-367-4977
<br />cover, regional vegetation and shallow flooding.
<br />Santa Ana River Mainstem, Reach 9,
<br />$ 13,048,010.73
<br />USACE - LA District
<br />Fernando Cano
<br />Improvements to a 2.4 -mile section of the north
<br />July 31, 2019
<br />Phase 5B; Orange Couty, CA
<br />909and705
<br />bank of the Santa Ana River Channel.
<br />e City of Carson
<br />Carson Stormwater Capture Facility at
<br />$ 11,562,311.84
<br />Julio Gonzalez
<br />Diverting urban and stormwater runoff into a
<br />April 22, 2020
<br />Carriage Crest Park; LA County, CA
<br />(310)952-1700
<br />Fxt 1829
<br />detention basin underneath the park fields.
<br />Potrero Canyon Park -Grading; Pacific
<br />LA Recreation & Park=_
<br />Final grading of the canyon to buttress the over -
<br />$ 17,222,522.82
<br />Pedro Garcia
<br />steepened slopes and create a riparian zone
<br />August 18, 2020
<br />Palisades, CA
<br />213-847-4727
<br />through center of the canyon
<br />Caltrans
<br />Adding an HOV lane, removal concrete barrier,
<br />HOV lanes on State Highway from Grand
<br />$ 25,571,922.84
<br />Mohammad Ravanipour, PE
<br />widening outside lane, removal of HOV access to
<br />December 17, 2020
<br />Ave. to Ball road; Orange County, CA
<br />(949)279-8407
<br />Main St from 0.4 Mile South of Grand Ave. to Ball
<br />Rd.
<br />New York City Economic Development Corp.
<br />Construction of a (9,440 -foot -long and 12.5 -foot
<br />Water Siphon; Staten Island, NY
<br />$ 136,580,403.09
<br />Padrick Askew
<br />diameter EPB TBM) potable water transmission
<br />Dec -18
<br />212-312-3805
<br />main (siphon).
<br />US 290 — Segment 4 Construction;
<br />$ 169,147,877.33
<br />TxDOT
<br />Frank Leong
<br />Road widening and reconstruction. 2.026 miles
<br />November 6, 2020
<br />Hams County, TX
<br />713-934-5920
<br />(1.472 miles- roadway+.554 miles - bridge)
<br />SH121 widening, segment 13; Dallas
<br />$ 59,860,148.29
<br />TxDOT
<br />Jason Mashell
<br />Widening and upgrade of over 2.5 miles of SH 121
<br />December 23, 2017
<br />County, TX
<br />(214) 207-1635 Ext 18`2
<br />from four to ten lanes
<br />TxDOT - Texas Department of T,ansportation
<br />Removal of an existing two-lane bridge spanning IH
<br />IH 35 at Yarrington Road
<br />$ 12,595,230.56
<br />Victor Vargas
<br />35 and replacing it with a four -lane bridge, plus two
<br />October 21, 2016
<br />Austin, TX
<br />512-282-2113
<br />raised turnarounds on each side
<br />TxDOT
<br />Reconstruction of an existing road with grading,
<br />Williamson County FM 685
<br />$ 11,162,108.68
<br />Mike McKissick
<br />structures, water line, asphalt concrete, paving,
<br />January 2, 2017
<br />Hutto, TX
<br />512-997-2200
<br />signing, pavement markings, and electrical work.
<br />Completed Projects Page 2