Laserfiche WebLink
OHL USA, Inc. - Projects Completed Within Last Five Years <br />Project Name <br />Contract Value <br />Project Owner and Contact <br />Description <br />Completion Date <br />Palos Verdes Reservior Upgrade; Los <br />MWD <br />Replacement of the concrete liner with an asphalt <br />Angeles County, CA <br />$ 31,775,845.82 <br />Everitt Mundkowsky <br />liner overlain by an impermeable geomembrane <br />July 9, 2019 <br />7144763728 <br />lining system. <br />Ow <br />Owens Lake Dust Mitigation -Phase 9/10; <br />OwCounty, <br />LADWP <br />Development of 14 dust -control areas on a 3.6- <br />Inyo CA <br />$ 238,255,035.82 <br />Jaime Valenzuela <br />square -mile portion of a dry lake bed using gravel <br />December 31, 2017 <br />213-367-4977 <br />cover, regional vegetation and shallow flooding. <br />Santa Ana River Mainstem, Reach 9, <br />$ 13,048,010.73 <br />USACE - LA District <br />Fernando Cano <br />Improvements to a 2.4 -mile section of the north <br />July 31, 2019 <br />Phase 5B; Orange Couty, CA <br />909and705 <br />bank of the Santa Ana River Channel. <br />e City of Carson <br />Carson Stormwater Capture Facility at <br />$ 11,562,311.84 <br />Julio Gonzalez <br />Diverting urban and stormwater runoff into a <br />April 22, 2020 <br />Carriage Crest Park; LA County, CA <br />(310)952-1700 <br />Fxt 1829 <br />detention basin underneath the park fields. <br />Potrero Canyon Park -Grading; Pacific <br />LA Recreation & Park=_ <br />Final grading of the canyon to buttress the over - <br />$ 17,222,522.82 <br />Pedro Garcia <br />steepened slopes and create a riparian zone <br />August 18, 2020 <br />Palisades, CA <br />213-847-4727 <br />through center of the canyon <br />Caltrans <br />Adding an HOV lane, removal concrete barrier, <br />HOV lanes on State Highway from Grand <br />$ 25,571,922.84 <br />Mohammad Ravanipour, PE <br />widening outside lane, removal of HOV access to <br />December 17, 2020 <br />Ave. to Ball road; Orange County, CA <br />(949)279-8407 <br />Main St from 0.4 Mile South of Grand Ave. to Ball <br />Rd. <br />New York City Economic Development Corp. <br />Construction of a (9,440 -foot -long and 12.5 -foot <br />Water Siphon; Staten Island, NY <br />$ 136,580,403.09 <br />Padrick Askew <br />diameter EPB TBM) potable water transmission <br />Dec -18 <br />212-312-3805 <br />main (siphon). <br />US 290 — Segment 4 Construction; <br />$ 169,147,877.33 <br />TxDOT <br />Frank Leong <br />Road widening and reconstruction. 2.026 miles <br />November 6, 2020 <br />Hams County, TX <br />713-934-5920 <br />(1.472 miles- roadway+.554 miles - bridge) <br />SH121 widening, segment 13; Dallas <br />$ 59,860,148.29 <br />TxDOT <br />Jason Mashell <br />Widening and upgrade of over 2.5 miles of SH 121 <br />December 23, 2017 <br />County, TX <br />(214) 207-1635 Ext 18`2 <br />from four to ten lanes <br />TxDOT - Texas Department of T,ansportation <br />Removal of an existing two-lane bridge spanning IH <br />IH 35 at Yarrington Road <br />$ 12,595,230.56 <br />Victor Vargas <br />35 and replacing it with a four -lane bridge, plus two <br />October 21, 2016 <br />Austin, TX <br />512-282-2113 <br />raised turnarounds on each side <br />TxDOT <br />Reconstruction of an existing road with grading, <br />Williamson County FM 685 <br />$ 11,162,108.68 <br />Mike McKissick <br />structures, water line, asphalt concrete, paving, <br />January 2, 2017 <br />Hutto, TX <br />512-997-2200 <br />signing, pavement markings, and electrical work. <br />Completed Projects Page 2 <br />