My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-009
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 11:32:44 AM
Creation date
2/7/2022 10:33:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/11/2022
Control Number
2022-009
Agenda Item Number
8.O..
Entity Name
OHL, USA, Inc. and Subsidiaries
Subject
6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street
Project Number
IRC-1638
Bid Number
2022008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OHL USA, Inc. - Projects Completed Within Last Five Years <br />Project Name <br />Contract Value <br />Project Owner and Cortact <br />Description <br />Completion Date <br />The scope of work included milling, resurfacing, and <br />Resurface Turnpike MP 178.287 to MP <br />FDOT - Turnpike <br />safety and design upgrade improvements for the <br />185.000; Indian River and Okeechobee <br />$ 15,843,682.08 <br />Peter Nissen, P.E. <br />Turnpike Mainline (SR 91), from Milepost (MP) <br />Aug -18 <br />Counties, FL <br />954-975-4855 <br />178.287 to Milepost (MP) 185.000 in Indian River and <br />Okeechobee counties. <br />SR -9 (1-95) and SR -9 (1-905) Improvements; <br />FDOT <br />The scope of work included milling and resurfacing, <br />$ 17,184,516.93 <br />Paul Lampley, RE <br />cross slope correction, signing and pavement, <br />Nov -18 <br />Marlin and Palm Beach, FL <br />954-777-4384 <br />guardrail reset/replacement, approach slab work <br />Improvement works: milling and resurfacing Florida's <br />Turnpike (SR 91) from the West Palm Beach Services <br />Plaza to South of the West Palm Beach Canal (MM <br />FDOT - Turnpike <br />94.309 to MM 102.462) including the ramps at SR 80 <br />Resurface Turnpike MP 94.5-102.5 and MP <br />$ 16,868,340.48 <br />Peter Nissen, P.E. <br />(Southern Blvd.), Jog Road and SR 704 (Okeechobee <br />Oct -18 <br />103.7-106.1; Palm Beach County, FL <br />954-975-4855 <br />Boulevard) and milling and resurfacing from 45th St to <br />SR 710/CSXRR (MM 103.684 to MM 106.098); <br />includes safety upgrades and signing and pavement <br />markings. <br />The scope of work includes pavement milling, <br />texturizing, new asphalt and concrete pavement <br />construction, pavement grooving, underground water <br />Miami -Dade County <br />mains and fire hydrants, high mast lighting, gravity <br />Miami International Airport Runway 12/30 <br />Aviation Department <br />walls, retaining walls, drainage and pollution control <br />$ 43,654,066.00 <br />E.W. Franklin Stirrup, III <br />system replacement marking, sodding. The project <br />Feb -16 <br />Pavement Rehabilitation <br />MDAD Project Manager <br />also includes runway and taxiway airfield light system <br />305-876-7922 <br />replacement and upgrades of: conduit, conductor, <br />base cans transformers, grade adjustment, signs, <br />threshold MALSR lighting replacement and <br />maintenance of airfield and landside traffic. <br />Completed Projects Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.