Laserfiche WebLink
OHL USA, Inc. - Projects Completed Within Last Five Years <br />Project Name <br />Contract Value <br />Project Owner and Contact <br />Description <br />Completion Date <br />FDOT <br />The Design -Build (DB) team constructed 10 miles of <br />SR -826 (Palmetto Expressway)/1-75 (SR -93) <br />$ 261,893,925.00 <br />Emmanuel Espial <br />express lanes along SR 826 and another three miles <br />Jun -18 <br />Express Lanes; Miami -Dade, FL <br />305-640-7414 <br />along 1-75. <br />1-95 at Woolbright Rd in the City of Boynton Beach, 1- <br />FDOT <br />10th Ave Nin the City of Lake Worth, I-95 at <br />1-95 Interchange Broward / Palm Beach; <br />$ 32,990,655.00 <br />Carolyn Gish, P.E. District Constriction <br />H ypoluxo Rd in Town of Lantana, I-95 at Donald Ross <br />May -16 <br />Broward County, FL <br />Engineer <br />Engineer <br />Rd in City of Jupiter, 1-95 at SW 10th St in the City of <br />954-777- <br />Deerfield Bch <br />FOOT <br />Reconstruction of SR -7 from Fillmore St to <br />$ 29,659,698.00 <br />Carolyn Gish, P.E. District Construction <br />Reconstruction of SR -7 from North of Fillmore Street <br />Sep -18 <br />Stirling Rd; Broward County, FL <br />Engineer <br />to South of Stirling Road, Broward <br />954-777-4384 <br />FOOT <br />Construction of a 3.1 -mile, four -lane tolled roadway <br />1-75 Express Lanes, segment A/B; <br />$ 233,018,220.00 <br />Carolyn Gish, P.E. District Construction <br />within the 166 -foot -wide median of 1-75, featuring two <br />Oct -18 <br />Miami, FL <br />Engineer <br />lanes on each side of the barrier wall. <br />954-7T7-4384 <br />Collier Boulevard (CR951) Roadway Capacity <br />Collier County <br />Improvements (from Green Boulevard to <br />$ 21,403,299.87 <br />Brenda Brilhart <br />Construction of a six -lane improvements from Green <br />October 27, 2017 <br />Golden Gale Boulevard <br />239-252-8446 <br />Boulevard to Golden Gate Boulevard. <br />Collier County, FL <br />Construction of All Bridges and Structures work within <br />All Aboard - C10 Miami to West Palm Beach/1-rail Rail <br />All Aboard Florida (AAF) / Archer Western <br />(67 miles). The AAF project required to rehabilitate <br />All Aboard Florida (AAF) C-10 rail corridor; <br />$ 35952661 <br />Construction (CAC is sub to AWC) <br />the existing main track and construct the proposed <br />September 16, 2017 <br />Miami to West Palm Beach, FL <br />,,.79 <br />Daniel P. Walsh (Archer Western) <br />second main track. Scope included grading, track <br />312-563-5400 <br />construction, track shifting, grade crossing track, <br />signal, civil and structures construction, utility <br />adjustments and fiber optic duct bank installation. <br />SR -821 (HEFT) Improvements from Bird <br />FDOT <br />Widening often future travel lanes with four Express <br />Road to SR -836 (Dolphin Expressway); Miami <br />$ 111,500,000.00 <br />Peter Nissen, P.E. <br />Toll (interior) Lanes, plus auxiliary lanes in NB and SB <br />Feb -19 <br />Dade, FL <br />954-975-4855 <br />directions between the interchanges. <br />FDOT <br />SR -76 (Kanner Highway) from SW Lost River Road <br />SR -76 Kanner Highway Reconstruction; <br />$ 20,941,519.00 <br />Dan Hiden, P.E. Operations Engineer <br />(MP 25.780) to South of SR 714 (SE Monterey Road) <br />Sep -18 <br />Palm Beach County, FL <br />954-777-4384 <br />(MP 30.047) in Palm Beach County <br />Completed Projects Page 4 <br />