OHL USA, Inc. - Projects Completed Within Last Five Years
<br />Project Name
<br />Contract Value
<br />Project Owner and Contact
<br />Description
<br />Completion Date
<br />FDOT
<br />The Design -Build (DB) team constructed 10 miles of
<br />SR -826 (Palmetto Expressway)/1-75 (SR -93)
<br />$ 261,893,925.00
<br />Emmanuel Espial
<br />express lanes along SR 826 and another three miles
<br />Jun -18
<br />Express Lanes; Miami -Dade, FL
<br />305-640-7414
<br />along 1-75.
<br />1-95 at Woolbright Rd in the City of Boynton Beach, 1-
<br />FDOT
<br />10th Ave Nin the City of Lake Worth, I-95 at
<br />1-95 Interchange Broward / Palm Beach;
<br />$ 32,990,655.00
<br />Carolyn Gish, P.E. District Constriction
<br />H ypoluxo Rd in Town of Lantana, I-95 at Donald Ross
<br />May -16
<br />Broward County, FL
<br />Engineer
<br />Engineer
<br />Rd in City of Jupiter, 1-95 at SW 10th St in the City of
<br />954-777-
<br />Deerfield Bch
<br />FOOT
<br />Reconstruction of SR -7 from Fillmore St to
<br />$ 29,659,698.00
<br />Carolyn Gish, P.E. District Construction
<br />Reconstruction of SR -7 from North of Fillmore Street
<br />Sep -18
<br />Stirling Rd; Broward County, FL
<br />Engineer
<br />to South of Stirling Road, Broward
<br />954-777-4384
<br />FOOT
<br />Construction of a 3.1 -mile, four -lane tolled roadway
<br />1-75 Express Lanes, segment A/B;
<br />$ 233,018,220.00
<br />Carolyn Gish, P.E. District Construction
<br />within the 166 -foot -wide median of 1-75, featuring two
<br />Oct -18
<br />Miami, FL
<br />Engineer
<br />lanes on each side of the barrier wall.
<br />954-7T7-4384
<br />Collier Boulevard (CR951) Roadway Capacity
<br />Collier County
<br />Improvements (from Green Boulevard to
<br />$ 21,403,299.87
<br />Brenda Brilhart
<br />Construction of a six -lane improvements from Green
<br />October 27, 2017
<br />Golden Gale Boulevard
<br />239-252-8446
<br />Boulevard to Golden Gate Boulevard.
<br />Collier County, FL
<br />Construction of All Bridges and Structures work within
<br />All Aboard - C10 Miami to West Palm Beach/1-rail Rail
<br />All Aboard Florida (AAF) / Archer Western
<br />(67 miles). The AAF project required to rehabilitate
<br />All Aboard Florida (AAF) C-10 rail corridor;
<br />$ 35952661
<br />Construction (CAC is sub to AWC)
<br />the existing main track and construct the proposed
<br />September 16, 2017
<br />Miami to West Palm Beach, FL
<br />,,.79
<br />Daniel P. Walsh (Archer Western)
<br />second main track. Scope included grading, track
<br />312-563-5400
<br />construction, track shifting, grade crossing track,
<br />signal, civil and structures construction, utility
<br />adjustments and fiber optic duct bank installation.
<br />SR -821 (HEFT) Improvements from Bird
<br />FDOT
<br />Widening often future travel lanes with four Express
<br />Road to SR -836 (Dolphin Expressway); Miami
<br />$ 111,500,000.00
<br />Peter Nissen, P.E.
<br />Toll (interior) Lanes, plus auxiliary lanes in NB and SB
<br />Feb -19
<br />Dade, FL
<br />954-975-4855
<br />directions between the interchanges.
<br />FDOT
<br />SR -76 (Kanner Highway) from SW Lost River Road
<br />SR -76 Kanner Highway Reconstruction;
<br />$ 20,941,519.00
<br />Dan Hiden, P.E. Operations Engineer
<br />(MP 25.780) to South of SR 714 (SE Monterey Road)
<br />Sep -18
<br />Palm Beach County, FL
<br />954-777-4384
<br />(MP 30.047) in Palm Beach County
<br />Completed Projects Page 4