My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/16/2021
CBCC
>
Meetings
>
2020's
>
2020
>
11/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 12:11:17 PM
Creation date
2/10/2022 12:02:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/16/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provide part-time construction observation services, as outlined in the following Scope of <br />Services. <br />In addition, the Consultant will provide design services related to the minor drainage <br />improvements (relocation of two catch basins and associated piping) needed to <br />accommodate the evaporation system. The Consultant will also provide coordination with <br />the design team(s) for several ongoing projects that will require site plan modifications The <br />Consultant will incorporate the design of each of those projects (by others) into a single <br />major site plan modification application. <br />SCOPE OF SERVICES <br />Task 1: Landfill Roadway Improvements <br />Subtask 1.1 - Conceptual Layout and Construction Sequencing Plan (Lump Sum) <br />It is critical to landfill operations that access to the yard waste drop-off area be maintained <br />as driveway improvements are being made. Therefore, the Consultant will prepare a <br />conceptual layout of the improved driveway, including provisions to maintain the existing <br />driveway during construction. Upon completion of the improved driveway, the existing <br />driveway will be improved, paved and tied into the new entrance. The conceptual layout <br />will include notes related to construction sequencing for confirmation by SWDD staff prior <br />to proceeding with design. This task includes one review meeting with SWDD. Any <br />significant changes to the driveway configuration after approval of the conceptual layout <br />may result in the need for additional design fees to be authorized. <br />Subtask 1.2 — Design Services (Lump ,Sum) <br />Once the conceptual layout has been approved by SWDD, the Consultant will proceed with <br />preparing the design documents. The design for the roadway/driveway improvements will <br />be incorporated into the bid package begin prepared under Work Order No. 45 for the entry <br />scale improvements. As a result, the submittal dates will mirror those in Work Order No. <br />45; however, the driveway improvements will be reflected primarily in the 90 percent <br />submittal (no need for detailed 30 or 60 percent). It is anticipated that all survey and <br />geotechnical needs for the driveway improvements will be obtained during the survey <br />conducted for the scale improvements. No additional survey or geotechnical services are <br />included in this Scope of Services. <br />The design will include extension of the existing CMP drainage culvert to the west; <br />installation of a pipe sleeve for the future landfill gas line (in the extents of the <br />improvements only); installation of a pipe sleeve for a future water line for future hydrant <br />installation (in the extents of the improvements only); widening of the driveway to the west <br />to accommodate 2 new, 12 -foot travel lanes (paved), improved shoulders, landfill gas <br />pipeline crossing and future water line crossing; and installation of guardrails. <br />49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.