My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/16/2021
CBCC
>
Meetings
>
2020's
>
2020
>
11/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 12:11:17 PM
Creation date
2/10/2022 12:02:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/16/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subtask 1.2.1— 30 Percent Design <br />The Consultant will add the driveway survey information to the base plan set for the <br />bypass scale project. The 30 percent deliverable will be limited to extending the base <br />plan set to cover the western extent of the driveway improvements (detailed design to <br />be provided in 90 percent submittal). <br />Subtask 1. 2.2 — 60 Percent Design <br />The Consultant will prepare 60 percent plans and specifications to be incorporated in <br />the Work Order No. 45 bid package for use by the County in soliciting competitive bids <br />for construction of the project. The 60 percent design will consist of the conceptual <br />layout for the proposed driveway improvements. The detailed design will be included <br />in the 90 percent bid package. <br />Subtask 1. 2.3 — 90 Percent Design and Final Bid Package <br />The 90 percent design submittal will include detailed design of civil (paving, grading, <br />drainage, signage), pipe crossings, culvert extension, guard rails, subgrade <br />stabilization, and site restoration components. Environmental services related to <br />surface water impacts, gopher tortoise relocation, etc. are not included in this scope of <br />services. These services can be provided, if needed, under separate authorization or <br />amendment to this Work Order. Two full size sets of plans and two hardcopy sets of <br />draft specifications will be provided in conjunction with the 90 percent milestone on <br />Work Order No. 45, along with an electronic copy (PDF format) for the County's <br />review. <br />A review meeting will be conducted with SWDD staff to discuss review comments and <br />final modifications to be made to the bid package. The consultant will incorporate final <br />comments and coordinate with procurement to prepare the final bid package (in <br />conjunction with Work Order No. 45) for use in advertising the project. The Consultant <br />will provide a final PDF of the bid documents to SWDD and procurement for use in <br />soliciting bids. <br />Subtask 1.3 — Permitting Services (Lump Sum) <br />The Consultant will prepare an application for the IRFWCD connection permit to extend <br />the canal crossing/CMP culvert. This task will include a pre -application meeting, <br />preparation of the permit application and supporting documentation and participation in <br />the IRFWCD board meeting when the application is to be approved. Application fee(s) to <br />be paid directly by County and are not included in this Scope of Services. <br />It is anticipated that the driveway improvements can be incorporated into the application <br />for a major site plan modification being completed for the concurrent bypass scale <br />improvements project (under Work Order No. 45). No additional services are included <br />for site plan approval. <br />The proposed project is not anticipated to require modification of the FDEP landfill <br />operations permit, stormwater/ERP permits or a new County stormwater permit. The <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.