Laserfiche WebLink
ORDER NO. PSC-2021-0442-FOF-EI <br />DOCKET NO. 20210001 -EI <br />PAGE 28 <br />FPL/GULF: The appropriate capacity cost, recovery factors for the period January 2022 <br />through December 2022 is shown in Table 33-2 below: <br />Table 33-2 <br />FPL Canacitv Cost Recovery Factors for the neriod Januarv-Decemhpr_ 222 <br />Source: Appendix IV — 2022 CCR Projections (Exhibit RBD -7, Page 4 of 30). <br />261 <br />2022 <br />Capacity Cost <br />RecoveryFactors <br />Sum of <br />Reservation <br />Daily <br />Rate Schedule <br />Demand <br />Demand <br />$/kW <br />$/kWh <br />Charge <br />Charge <br />(RDC) <br />( <br />$/kW <br />(SDD) <br />$/kW <br />RSI/RTR1 <br />- <br />0.00239 <br />- <br />- <br />GS 1 /GST 1 <br />- <br />0.00248 <br />- <br />- <br />GSD I/GSDT1/HLFTI/GSD1-EV <br />0.81635 <br />- <br />- <br />- <br />OS2 <br />- <br />0.00144 <br />- <br />- <br />GSLD1/GSLDTI/CSI/CST1/HLFT2/GSLD1- <br />0.90050 <br />- <br />- <br />- <br />EV <br />GSLD2/GSLDT2/CS2/CST2/HLFT3 <br />0.90087 <br />- <br />- <br />- <br />GSLD3/GSLDT3/CS3/CST3 <br />0.81843 <br />- <br />- <br />- <br />SST1T <br />- <br />- <br />0.10 <br />0.05 <br />SST1D1/SST1D2/SST1D3 <br />- <br />- <br />0.11 <br />0.05 <br />CILC D/CILC G <br />'0.91616 <br />- <br />- <br />- <br />CILC T <br />0.88907 <br />- <br />- <br />- <br />MET <br />0.77422 <br />- <br />- <br />- <br />OL1/SLI/SLIM/PL1/OSI/II <br />- <br />0.00018 <br />- <br />- <br />SL2/SL2M/GSCU1 <br />- <br />0.00160 <br />- <br />- <br />Source: Appendix IV — 2022 CCR Projections (Exhibit RBD -7, Page 4 of 30). <br />261 <br />