Laserfiche WebLink
ORDER NO. PSC-2021-0442-FOF-EI <br />DOCKET NO. 20210001 -EI <br />PAGE 29 <br />TECO: The appropriate capacity cost recovery factors for the period January 2022 <br />through December 2022 is shown in Table 33-3 below: <br />Table 33-3 <br />TECO Capacity Cost Recovery Factors for the neriod January-Decemher_ 2022 <br />Rate Class and Metering Voltage <br />2022 Capacity Cost Recovery Factors <br />0/kWh <br />$/kW <br />RS <br />0.031 <br />GS and CS <br />i 0.027 <br />GSD, RSD Standard <br />Secondary <br />0.09 <br />Primary <br />0.09 <br />Transmission <br />0.09 <br />GSD Optional <br />Secondary <br />0.022 <br />Primary <br />0.022 <br />Transmission <br />0.022 <br />GSLDPR/GSLDTPR/SBLDPR/SBLDTPR <br />_ <br />0.08 <br />GSLDSU/GSLDTSU/SBLDSU/SBLDTSU <br />0.07 <br />LS -1, LS -2 <br />0.004 <br />- <br />Source: Exhibit MAS -3, Document Number 1, Page 3 of 4 (amended filing 10/1/2021). <br />III. EFFECTIVE DATE <br />ISSUE 34: What should be the effective date of the fuel adjustment factors and capacity <br />cost recovery factors for billing purposes? <br />Stipulation: The new factors should be effective beginning with the first billing cycle for <br />January 2022 through the last billing cycle for December 2022. The first billing <br />cycle may start before January 1, 2022, and the last cycle may be read after <br />December 31, 2022, so that each customer is billed for twelve months regardless <br />of when the recovery factors became effective. The new factors shall continue in <br />effect until modified by this Commission. <br />ISSUE 35: Should the Commission approve'revised tariffs reflecting the fuel adjustment <br />factors and capacity cost recovery factors determined to be appropriate in <br />this proceeding? <br />Stipulation: Yes. The Commission should approve revised tariffs reflecting the fuel adjustment <br />factors and capacity cost recovery, factors determined to be appropriate in this <br />proceeding. The Commission should direct Staff to verify that the revised tariffs are <br />consistent with the Commission decision. <br />Zm - I <br />