Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />14 December 2021 <br />Page 7 <br />software in accordance with Section V.E of the WQMP. According to the WQMP, monitoring <br />test results must be submitted to FDEP within 60 days from completion of laboratory analyses. <br />Phase 3 — Quarterly Assessment Monitoring and Reporting (Both C&D Debris Disposal <br />Facility and Class I Landfill) <br />Geosyntec will perform quarterly sampling events for Calendar Year 2022 (January, April, July, <br />and October) of six (6) groundwater wells (MW-2IS, MW -40S, MW -495, MW -50S, MW-5IS, <br />and MW -52S) and four (4) surface water sample sites (SW -LC 1, SW-LC3, LC-SW4, and LC- <br />SW6) for the C&D debris disposal facility and at four (4) groundwater monitoring wells (MW - <br />14S, MW -53S, MW -54S, and MW -54I) and four (4) surface water samples (C5 -SWI, SW -MW - <br />14S, SW -MW -53S, and SW -MW -54S) for the Class I landfill. <br />The January and July sampling will be performed as part of the semi-annual sampling program <br />under Phase 2 for the C&D debris disposal facility and assumed to take three (3) days to <br />complete. The April and October data collection and sampling will each take four (4) days to <br />complete. Geosyntec will deliver the samples to ENCO laboratory for analytical testing under <br />SWDD's contract (i.e., ENCO will directly invoice SWDD for laboratory charges). <br />For the C&D debris disposal facility, the quarterly assessment monitoring samples (including <br />those collected in January and July) will be analyzed for the routine monitoring parameters listed <br />in Paragraph 8 of the WQMP (C&D Permit) plus arsenic and benzene. I <br />For the Class I landfill, the quarterly assessment groundwater monitoring samples will be <br />sampled for parameters as required by subparagraph 62-701.510(6)(x)3, F.A.C. The surface <br />water samples will be screened for field parameters. <br />Geosyntec will assist SWDD in coordinating the analytical testing activities with ENCO, notify <br />FDEP prior to sampling as required by the WQMP, review and evaluate the analytical test <br />results, and prepare a letter report for each quarterly assessment monitoring event. <br />The letter reports will be submitted in draft forms to SWDD for review and comment and will be <br />finalized, with SWDD's comments implemented, for submittal to FDEP. Any changes to the <br />monitoring and reporting requirements that might be requested by FDEP based on the results of <br />the quarterly assessment monitoring will be performed under Phase 5 below. <br />Phase 4 — Title V Permit Compliance and Reporting <br />Geosyntec will assist SWDD in complying with the operation, monitoring, and reporting <br />requirements for of the active landfill gas collection and control system (GCCS) under the <br />NCP2021-3441/JL21090 2022 Compliance Monitoring Proposal. Final Am <br />