My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-014
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2022 3:10:24 PM
Creation date
2/21/2022 3:09:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/18/2022
Control Number
2022-014
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc
Subject
Work Order No. 14 for Annual Permit, Compliance Monitoring, and Reporting for 2022.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />14 December 2021 <br />Page 7 <br />software in accordance with Section V.E of the WQMP. According to the WQMP, monitoring <br />test results must be submitted to FDEP within 60 days from completion of laboratory analyses. <br />Phase 3 — Quarterly Assessment Monitoring and Reporting (Both C&D Debris Disposal <br />Facility and Class I Landfill) <br />Geosyntec will perform quarterly sampling events for Calendar Year 2022 (January, April, July, <br />and October) of six (6) groundwater wells (MW-2IS, MW -40S, MW -495, MW -50S, MW-5IS, <br />and MW -52S) and four (4) surface water sample sites (SW -LC 1, SW-LC3, LC-SW4, and LC- <br />SW6) for the C&D debris disposal facility and at four (4) groundwater monitoring wells (MW - <br />14S, MW -53S, MW -54S, and MW -54I) and four (4) surface water samples (C5 -SWI, SW -MW - <br />14S, SW -MW -53S, and SW -MW -54S) for the Class I landfill. <br />The January and July sampling will be performed as part of the semi-annual sampling program <br />under Phase 2 for the C&D debris disposal facility and assumed to take three (3) days to <br />complete. The April and October data collection and sampling will each take four (4) days to <br />complete. Geosyntec will deliver the samples to ENCO laboratory for analytical testing under <br />SWDD's contract (i.e., ENCO will directly invoice SWDD for laboratory charges). <br />For the C&D debris disposal facility, the quarterly assessment monitoring samples (including <br />those collected in January and July) will be analyzed for the routine monitoring parameters listed <br />in Paragraph 8 of the WQMP (C&D Permit) plus arsenic and benzene. I <br />For the Class I landfill, the quarterly assessment groundwater monitoring samples will be <br />sampled for parameters as required by subparagraph 62-701.510(6)(x)3, F.A.C. The surface <br />water samples will be screened for field parameters. <br />Geosyntec will assist SWDD in coordinating the analytical testing activities with ENCO, notify <br />FDEP prior to sampling as required by the WQMP, review and evaluate the analytical test <br />results, and prepare a letter report for each quarterly assessment monitoring event. <br />The letter reports will be submitted in draft forms to SWDD for review and comment and will be <br />finalized, with SWDD's comments implemented, for submittal to FDEP. Any changes to the <br />monitoring and reporting requirements that might be requested by FDEP based on the results of <br />the quarterly assessment monitoring will be performed under Phase 5 below. <br />Phase 4 — Title V Permit Compliance and Reporting <br />Geosyntec will assist SWDD in complying with the operation, monitoring, and reporting <br />requirements for of the active landfill gas collection and control system (GCCS) under the <br />NCP2021-3441/JL21090 2022 Compliance Monitoring Proposal. Final Am <br />
The URL can be used to link to this page
Your browser does not support the video tag.