Laserfiche WebLink
The evaporation system/leachate storage tank will also require minor electrical <br /> improvements to support a new control panel and SCADA equipment. This task will <br /> include up to 24 hours of effort for the Consultant's electrical engineer to prepare drawings <br /> limited to this panel. The panel will include provisions for a portable generator receptacle. <br /> Page 4 of 7 <br />